Permit Information
Permit NumberFIR17-00326
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 7746 W EMERALD ST
Project NameMarena Bldg 9
Customer Number 
ePlanReviewYes
Description
[Marena Building #9]
The fire sprinkler scope of work consists of two level four plex protected per NFPA 13R. The top level will have the piping tented. The sprinklers are residential type.

[BLD16-04311]
For the construction of a 3,680 sq. ft. 2 story 4 plex with work to include general site work and construction of the building per the approved plans. This building is fully fire sprinklered for R-2 occupancy. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/20/201712/21/201712/21/2017PPASS
DetailsTroy Cobbley
Permit finaled

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in/Hydro12/18/201712/18/201712/18/2017PPASS
DetailsTroy Cobbley
Overhead hydro test passed

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Supply line flush12/7/201712/7/201712/7/2017PPASS
DetailsTroy Cobbley
Underground flush passed
INSP-Sprinkler Rough-in10/20/201710/20/201710/20/2017PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
INSP-Sprinkler Rough-in9/25/20179/26/20179/26/2017PPASS
DetailsTroy Cobbley
Underground rough to cover passed. Piping can be covered.
INSP-Sprinkler Rough-in9/20/20179/21/20179/20/2017PCANC
DetailsTroy Cobbley
Underground rough in Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
Permit Ready to Issue  6/27/2017 DONE
Issue and Print Permit  6/27/2017 DONE
Inspection Record Card- Fire6/27/2017 6/27/2017 DONE
DetailsTiffany Carson-Herker
Intake Approval  6/26/2017 PASS
Plan assigned to (Tim)6/26/2017 6/26/2017 DONE
DetailsTim Frost
Sprinkler Plan Check6/26/2017 6/26/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  6/26/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  6/26/2017 DONE
DetailsTim Frost
Application received  6/22/2017 DONE
Application submitted via PDS Online on Jun 22 2017 12:25PM