INSP-Final Inspection | 7/26/2018 | 7/26/2018 | 7/26/2018 | P | PASS |
Jim Page
|
|
|
Final inspection completed on 7/20/2017, wrong inspection request was assigned at final inspection, request was for a rough in inspection.
|
INSP-Sprinkler Rough-in/Hydro | 7/18/2017 | 7/19/2017 | 7/20/2017 | P | PASS |
Jim Page
|
|
|
Inspection for Dry Chemical fire suppression system in paint booth passed/complete.
|
Plan assigned to (Tim) | 6/22/2017 | | 6/30/2017 | | DONE |
Tim Frost
|
|
|
|
Intake Approval | | | 6/30/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 6/30/2017 | | 6/30/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 6/30/2017 | | 6/30/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 6/30/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/30/2017 | | DONE |
Tim Frost
|
|
|
|
CHANGE STATUS TO (REV) | | | 6/30/2017 | | DONE |
|
|
|
change status from iss-was issued by mistake
|
Plan assigned to (Tim) | 6/30/2017 | | 6/30/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 6/30/2017 | | DONE |
|
|
|
|
Telephone call | | | 6/30/2017 | | DONE |
|
|
|
called Nate to let know permit ready
|
Issue and Print Permit | | | 6/30/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 6/30/2017 | | 6/30/2017 | | DONE |
Tisha Gallop
|
|
|
|
Application received | | | 6/23/2017 | | |
|
|
|
|