INSP-Final Inspection | 10/12/2017 | 10/13/2017 | 10/13/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Alarm Plan Check | 10/3/2017 | | 10/3/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/3/2017 | | DONE |
|
|
|
Plan mod approved. No review comments.
|
Permit Ready to Issue | | | 10/3/2017 | | DONE |
|
|
|
DO NOT REISSUE - plan mod
|
CHANGE STATUS TO (ISS) | | | 10/3/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 10/2/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 9/25/2017 | | DONE |
|
|
|
Phil requested the electronic work flow to be reopened.
|
INSP-Conference | 9/6/2017 | 9/7/2017 | 9/7/2017 | P | DONE |
Troy Cobbley
|
|
|
Adam and I discussed visual and audible sync for the fire alarm system.
Phone #: ###-####
|
INSP-Final Inspection | 7/19/2017 | 7/20/2017 | 7/20/2017 | P | FAIL |
Troy Cobbley
|
|
|
No testing was performed today due to the need for an additional strobe in the dead end corridor. Also per the installing technitions neither the strobes or horns sync through out the building which is an issue that will need addressed prior to a final sign off. Also the devices added under this permit are a different manufacturer and will need to be approved by plan review.
|
Permit Ready to Issue | | | 7/18/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/18/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/18/2017 | | 7/18/2017 | | DONE |
Christina Prado
|
|
|
|
Plan assigned to (Lee) | 7/12/2017 | | 7/12/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 7/12/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 7/12/2017 | | 7/12/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/12/2017 | | DONE |
|
|
|
Quick permit approved. No review comments.
|
Application received | | | 6/29/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 29 2017 10:24AM
|