INSP-Final Inspection | 7/13/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan assigned to (Tim) | 7/13/2017 | | 7/13/2017 | | DONE |
Tim Frost
|
|
|
|
Plan Modification Accepted | | | 7/13/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 7/13/2017 | | 7/13/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/13/2017 | | 7/13/2017 | | PASS |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/13/2017 | | 7/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/13/2017 | | DONE |
Tim Frost
|
|
|
|
INSP-Final Inspection | 7/6/2017 | 7/7/2017 | 7/7/2017 | A | FAIL |
Troy Cobbley
|
|
|
Provide as builts to plan review showing the actual heads installed and the additional head that is needed under the tank. Provide the two additional hangers as discussed.
|
Intake Approval | | | 7/5/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 7/5/2017 | | 7/5/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 7/5/2017 | | 7/5/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 7/5/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 7/5/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 7/5/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/5/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/5/2017 | | 7/5/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 6/30/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jun 30 2017 8:34AM
|