INSP-Final Inspection | 8/14/2018 | 8/15/2018 | 8/15/2018 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Miscellaneous action | | | 8/14/2018 | | DONE |
|
|
|
Asbuilt drawings received, reviewed and approved. Uploaded to eplanreview.
|
INSP-Final Inspection | 7/20/2018 | 7/23/2018 | 7/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
Waiting on as-builts to be submitted/approved then this permit can be finaled
Rafe Phone #: ###-####
|
INSP-Final Inspection | 7/23/2018 | 7/23/2018 | 7/23/2018 | A | FAIL |
Troy Cobbley
|
|
|
The new smoke detector failed to operate. Still need as-builts.
|
INSP-Final Inspection | 7/19/2018 | 7/20/2018 | 7/20/2018 | A | FAIL |
Troy Cobbley
|
|
|
Need as-builts, need smoke detector in existing corridor, need additional strobe in Pharmacy.
Rafe Phone #: ###-####
|
INSP-Alarm Testing | 4/16/2018 | 4/16/2018 | 4/16/2018 | P | DONE |
Jim Page
|
|
|
Fire alarm testing for room 118 complete
|
INSP-Final Inspection | 3/12/2018 | 3/12/2018 | 3/12/2018 | A | PART |
Jim Page
|
|
|
Partial final inspection complete for fire alarm system, notated city approved drawings with red ink areas that have been finaled.
|
INSP-Alarm Testing | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | DONE |
Jim Page
|
|
|
Notated city approved drawings where testing is complete.
|
INSP-Alarm Testing | 12/12/2017 | 12/12/2017 | 12/12/2017 | P | DONE |
Troy Cobbley
|
|
|
Alarms complete in MOB but flow switch for the new sprinkler system covering the addition (connecting corridor) was not ready.
Call prior to going Phone #: 2085190509 >> Inspection requested via mobile web by Raff
|
INSP-Alarm Testing | 12/9/2017 | 12/11/2017 | 12/11/2017 | A | PART |
Jim Page
|
|
|
Alarm testing/inspection complete for HVAC unit shutdown, HVAC units reported to panel. Audio visual notification is complete, smoke detector testing complete. Smoke detector next to dishwasher was changed to a heat detector, panel programing will be completed before next inspection request. Door holders and flow switches still need to be tested/inspected.
|
Telephone call | | | 12/6/2017 | | DONE |
|
|
|
Shane wanted to know if the new MOB section could report to the existing fire alarm panel as a zone until the connecting section of the building was complete. I informed him that this was acceptable as long as the off normal condition of the MOB zone was indicating that it had originated from the new MOB section of the building. Shane also emailed this question and requested a written response that I did send.
|
INSP-Final Inspection | 11/24/2017 | 11/27/2017 | 11/27/2017 | A | PART |
Troy Cobbley
|
|
|
The fire alarm work/testing is complete for the new Pharmacy Rooms in the existing hospital. An additional chime was added.
Rafe Phone #: ###-####
|
INSP-Alarm Testing | 11/21/2017 | 11/22/2017 | 11/22/2017 | A | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the Pharmacy Rooms. A chime needs to be added to meet sound requirements prior to work being completed in this area.
|
Fees Due Hold | 10/3/2017 | | 10/11/2017 | | DONE |
|
|
|
|
INSP-Alarm Testing | 10/2/2017 | 10/2/2017 | 10/2/2017 | P | PART |
Troy Cobbley
|
|
|
The fire alarm system/devices for OR 141 passed.
Damon Phone #: ###-####
|
CHANGE STATUS TO (REV) | | | 9/18/2017 | | DONE |
|
|
|
Resubmittal changed status to review.
|
Alarm Plan Check | 9/18/2017 | | 9/18/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/18/2017 | | DONE |
|
|
|
Resubmittal approved. No additional review comments.
|
Plan Modification Accepted | | | 9/18/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/18/2017 | | DONE |
|
|
|
DO NOT REISSUE, Plan mod
|
CHANGE STATUS TO (ISS) | | | 9/18/2017 | | DONE |
|
|
|
plan mod approved, no need to re issue
|
(F) Reprint permit | | | 9/18/2017 | | DONE |
|
|
|
|
Telephone call | | | 9/15/2017 | | DONE |
|
|
|
Dante requested the workflow be reopened due to eye clinic being added to the current scope of work.
|
Permit Ready to Issue | | | 8/16/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 8/16/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 8/15/2017 | | DONE |
|
|
|
Workflow reopened for plan modification at Dante's request.
|
Plan Modification Accepted | | | 8/15/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (REV) | | | 8/15/2017 | | DONE |
|
|
|
|
Alarm Plan Check | 8/15/2017 | | 8/15/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/15/2017 | | DONE |
|
|
|
Plan modification approved. No additional review comments.
|
Permit Ready to Issue | | | 7/17/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/17/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/17/2017 | | 7/17/2017 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 7/13/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 7/13/2017 | | 7/13/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/13/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Plan assigned to (Lee) | 7/11/2017 | | 7/11/2017 | | DONE |
Lee G Meredith
|
|
|
|
Application received | | | 7/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 7 2017 1:42PM
|