INSP-Final Inspection | 7/24/2017 | 7/24/2017 | 7/24/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Final Inspection | 7/19/2017 | 7/20/2017 | 7/20/2017 | A | PART |
Troy Cobbley
|
|
|
Permit can be finaled when Lee has received the as-builts. Jeremy will re-schedule for monday final
|
INSP-Final Inspection | 7/17/2017 | 7/18/2017 | 7/18/2017 | P | FAIL |
Troy Cobbley
|
|
|
No testing performed. Need strobe coverage modified for the entire space including short corridor and restroom. As-builts to both plan review and myself is ok.
|
1st review completed | | | 7/13/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 7/13/2017 | | 7/13/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 7/13/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 7/13/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 7/13/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 7/13/2017 | | 7/13/2017 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 7/12/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Jul 12 2017 9:08AM
|
Plan assigned to (Lee) | 7/12/2017 | | 7/12/2017 | | DONE |
Lee G Meredith
|
|
|
|