Permit Information
Permit NumberFIR17-00389
StatusFinaled
Name DELTA FIRE SYSTEMS
Site Address 1111 W JEFFERSON ST Unit: STE 400
Project NameCradlepoint TI (4th Flr Boise)
Customer Number 
ePlanReviewYes
Description
[Cradle Point - Boise Plaza - 4th Floor - Unit # 400] - Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

[BLD17-01819] - Permit is to remodel approx. 478 sq. ft. space within the 44,466 sq. ft. fourth floor of the building. Approval is contingent upon adhering to the approved plans on file. Work to include: removal of select interior nonbearing walls, removal of select door/door frames, construction of interior nonbearing walls to create a storage room and an office, select new and relocated door/door frames, electrical work and interior finishes in compliance with Ch. 8 of the 2012 IBC. This building is fully Fire Sprinklered. The fire sprinkler system is required because this is a high-rise building and to allow the atrium. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **JG**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection9/5/20179/6/20179/6/2017APASS
DetailsJim Page
Final fire sprinkler inspection for area of work passed/complete
Plan Modification Accepted  8/17/2017 DONE
Sprinkler Plan Check8/17/2017 8/17/2017 DONE
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/17/2017 DONE
Permit Ready to Issue  8/17/2017 DONE
CHANGE STATUS TO (ISS)  8/17/2017 DONE
No fees per Tim Frost
(F) Reprint permit  8/17/2017 DONE
Sprinkler Plan Check7/21/2017 7/21/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  7/21/2017 DONE
DetailsTim Frost
Permit Ready to Issue  7/21/2017 DONE
Issue and Print Permit  7/21/2017 DONE
Inspection Record Card- Fire7/21/2017 7/21/2017 DONE
DetailsBrittany Hill
Intake Approval  7/20/2017 PASS
Plan assigned to (Tim)7/20/2017 7/20/2017 DONE
DetailsTim Frost
Sprinkler Plan Check7/20/2017 7/20/2017 FAIL
DetailsTim Frost
1st review completed  7/20/2017 FAIL
DetailsTim Frost
Application received  7/19/2017 DONE
Application submitted via PDS Online on Jul 19 2017 1:41PM