Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR17-00407
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 701 E BOISE AVE
Project NameTimberline H.S. Addition
Customer Number 
ePlanReviewYes
Description
Shilo will add a 4" feedmain from the riser room to a new 2 level addition with it's own riser manifold, gauges, and inspector's tests for each level. O.T.S. rooms will have upright sprinklers, hallways and classrooms will have new EC-11 heads. Small rooms and offices will have new standard spray pendents. There are several areas upstairs and on the main level that will be remodeled. As a result the sprinkler system will need to be adjusted in these areas.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection7/26/20187/30/20187/30/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Jon Beazer is the contact for this hydro/final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro7/26/20187/30/20187/30/2018ADONE
DetailsJim Page
Overhead hydrostatic test for overhead fire sprinkler piping witnessed, no pressure loss observed at riser provided gauge.

Jon Beazer is the contact for this Hydro/ Final inspection. Thank you for your help. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in3/26/20183/27/20183/27/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping in new addition complete, approved for cover. Hydrostatic test will need to be completed on new addition.
INSP-Sprinkler Rough-in3/7/20183/8/20183/8/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping on level 2 complete, level 2 approved for cover. Rough in inspection for level 1 complete, rough to cover inspection for overhead fire sprinkler piping located above hardlids on level 1 complete, level 1 hardlids approved for cover.
INSP-Sprinkler Rough-in2/26/20182/27/20182/27/2018PCANC
DetailsScott Arellano
Mike Martin will be the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus

*Inspection re-scheduled for tomorrow by applicant.*
INSP-Sprinkler Rough-in11/16/201711/17/201711/17/2017APART
DetailsJim Page
Rough in inspection for overhead fire sprinkler piping in the west side 2 level addition complete. A rough to cover inspection will need to scheduled for finished heads before cover can be approved.
Permit Ready to Issue  8/18/2017 DONE
Issue and Print Permit  8/18/2017 DONE
Inspection Record Card- Fire8/18/2017 8/18/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check8/17/2017 8/17/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/17/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/16/2017 8/16/2017 FAIL
DetailsTim Frost
Miscellaneous action  8/16/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  8/9/2017 PASS
Plan assigned to (Tim)8/9/2017 8/9/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/9/2017 8/9/2017 FAIL
DetailsTim Frost
1st review completed  8/9/2017 FAIL
DetailsTim Frost
Miscellaneous action  8/9/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  7/31/2017 DONE
Application submitted via PDS Online on Jul 31 2017 2:37PM