INSP-Final Inspection | 12/15/2017 | 12/15/2017 | 12/15/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | FAIL |
Troy Cobbley
|
|
|
As-builts did not match install
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Miscellaneous action | | | 12/11/2017 | | DONE |
|
|
|
As built drawings received.
|
INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | FAIL |
Troy Cobbley
|
|
|
Permit will be ok to final when as-builts have been provided to plan review.
|
INSP-Supply line flush | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Sprinkler Rough-in | 9/27/2017 | 9/28/2017 | 9/28/2017 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Tenting passed. Piping can be covered except for tie in area
|
Permit Ready to Issue | | | 8/3/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/3/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/3/2017 | | 8/3/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Plan assigned to (Lee) | 8/2/2017 | | 8/2/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/2/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 8/2/2017 | | 8/2/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/2/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Application received | | | 8/1/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 1 2017 4:10PM
|