Plan assigned to (Lee) | 8/7/2017 | | 4/2/2018 | | DONE |
Adele J Schaffeld-Griffin
|
|
|
|
INSP-Final Inspection | 8/14/2017 | 8/14/2017 | 8/14/2017 | P | PASS |
Jim Page
|
|
|
Previously noted items have been addressed/repaired. Final fire alarm inspection for area of work passed/complete.
|
INSP-Final Inspection | 8/11/2017 | 8/11/2017 | 8/11/2017 | P | FAIL |
Troy Cobbley
|
|
|
As-builts are needed showing all of the audio/visual devices and the accurate location of all devices. Coverage needs to be modified in two corridors and coverage provided in the other half of the Conference Room.
|
Issue and Print Permit | | | 8/11/2017 | | DONE |
|
|
|
|
Plan assigned to (Scott) | 8/7/2017 | | 8/10/2017 | | PASS |
Scott Arellano
|
|
|
NO comments attached to plans.
|
1st review completed | | | 8/10/2017 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/10/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/10/2017 | | 8/10/2017 | | DONE |
Tiffany Carson-Herker
|
|
|
|
Telephone call | | | 8/10/2017 | | DONE |
|
|
|
called Applicant to advise permit is ready and gave fees due
|
Permit Ready to Issue | | | 8/10/2017 | | DONE |
|
|
|
all met
|
Application received | | | 8/7/2017 | | |
|
|
|
|