Permit Information
Permit NumberFIR17-00427
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 518 E ORION CT
Project NameSHIRLEY RESIDENCE
Customer Number 
ePlanReviewYes
Description
[Shirley - Falash & Company] - Udg Only
New 2"x60'± CPVC underground
[BLD17-01532] - **POOL IS SEPARATE PERMIT** HILLSIDE, WUI ZONE "A" REQUIREMENTS, CLASS "A" ROOF REQUIRED. FIRE SPRINKLERS REQUIRED. GAZEBOS ARE NOT PART OF THIS PERMIT. Permit for the construction of a new 7427 sq. ft., two story (first story 5332 sq. ft., second story 2095 sq. ft.) single family dwelling with 3 bedrooms, 6.5 bathrooms, approximately 986 sq. ft. of covered patio/porch and a 1823 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1A zoning and setbacks per planning. **BJM** A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/12/201812/13/201812/12/2018APASS
DetailsJim Page
Final undergorund supply inspection complete.

Overhead was finaled and we realized this was complete also. Please call Adam with questions Phone #: ###-#### Inspection requested via web by Jeff Packham
INSP-Supply line flush6/18/20186/20/20186/20/2018ADONE
DetailsJim Page
Underground supply flush complete.

Lonnie. Please schedule for 10 AM Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Sprinkler Rough-in3/12/20183/13/20183/13/2018APASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover. Insulator will need to provide documentation for compatibility of spray foam insulation and CPVC.
INSP-Sprinkler Rough-in3/12/20183/12/20183/12/2018PCANC
DetailsJim Page
Inspection request was suppose to be scheduled for 13MAR2018 for the AM per conversation with general contractor Greg phone# ###-####. This request is cancelled and rescheduled for the correct coordinated date and time.
INSP-Sprinkler Rough-in8/16/20178/17/20178/17/2017APASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.
Permit Ready to Issue  8/16/2017 DONE
Issue and Print Permit  8/16/2017 DONE
Inspection Record Card- Fire8/16/2017 8/16/2017 DONE
DetailsBrittany Hill
Intake Approval  8/9/2017 PASS
Plan assigned to (Tim)8/9/2017 8/9/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/9/2017 8/9/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/9/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/9/2017 DONE
DetailsTim Frost
Application received  8/7/2017 DONE
Application submitted via PDS Online on Aug 7 2017 4:34PM