INSP-Final Inspection | 5/9/2018 | 5/10/2018 | 5/10/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 5/10/2018 | 5/10/2018 | 5/10/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test at static pressure of 50 psi for overhead fire sprinkler piping witnessed, no pressure loss observed.
|
INSP-Sprinkler Rough-in | 2/16/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
Plan Modification Accepted | | | 2/12/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 2/12/2018 | | 2/12/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 2/12/2018 | | 2/12/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/12/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 2/12/2018 | | DONE |
|
|
|
Plan Mod Approved
DO NOT REISSUE
|
(F) Reprint permit | | | 2/12/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/12/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 8/10/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/10/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/10/2017 | | 8/10/2017 | | DONE |
Candy A. Nichols
|
|
|
|
Intake Approval | | | 8/9/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/9/2017 | | 8/9/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/9/2017 | | 8/9/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/9/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/9/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 8 2017 2:38PM
|