INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Kyle Burgess
|
INSP-Final Inspection | 12/6/2017 | 12/7/2017 | 12/7/2017 | P | FAIL |
Troy Cobbley
|
|
|
All items tested ok except one of the three duct smoke detectors needs to be relocated to the narrow side of the rectangular duct and provided with the correct sample tube and re-tested.
|
Issue and Print Permit | | | 12/6/2017 | | DONE |
|
|
|
|
Miscellaneous action | | | 12/5/2017 | | DONE |
|
|
|
Mary requested workflow be opened for a plan modification.
|
Plan Modification Accepted | | | 12/5/2017 | | DONE |
|
|
|
Adding romm temperature sensors that will be monitored by the fire alarm system for sprinklers above ceiling.
|
Alarm Plan Check | 12/5/2017 | | 12/5/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 12/5/2017 | | DONE |
|
|
|
Plans approved. No additional review comments.
|
Permit Ready to Issue | | | 12/5/2017 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/29/2017 | 11/30/2017 | 11/30/2017 | P | FAIL |
Troy Cobbley
|
|
|
Missing all small documents, communication does not match plans, appears atleast two strobes need to be added. No testing performed.
|
Miscellaneous action | | | 11/14/2017 | | DONE |
|
|
|
Mary emailed syaing the FACP and NAC panels have been relocated to the managers office. Associated smoke detector has been relocated as well. I told her that since there is already a remote annunciator, relocation of the panels did not require a plan mod. Also, duct detectors are being supplied by the fire alarm contractor instead of the mechanical. Product data is to be provided with as built drawings prior to acceptance. Plan mod not required since notification and loads are not affected.
|
Miscellaneous action | | | 11/14/2017 | | DONE |
|
|
|
As build drawings received and filed in eplan review.
|
Issue and Print Permit | | | 8/15/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/15/2017 | | 8/15/2017 | | DONE |
Brittany Hill
|
|
|
|
Plan assigned to (Lee) | 8/14/2017 | | 8/14/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 8/14/2017 | | DONE |
|
|
|
Failed pre-screen review. Drawings all combined as a single file. Emailed Mary to let her know individual drawing files are required. She respoinded to say she will resubmit.
|
Miscellaneous action | | | 8/14/2017 | | DONE |
|
|
|
Received drawings seperated into individual files. Scale graph is not right. Requested correction.
|
Alarm Plan Check | 8/14/2017 | | 8/14/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 8/14/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 8/14/2017 | | DONE |
|
|
|
|
Application received | | | 8/9/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 9 2017 12:06PM
|