INSP-Final Inspection | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Rick Phone #: ###-####
|
INSP-Sprinkler Rough-in | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | PASS |
Troy Cobbley
|
|
|
The exterior canopies have been fire blocked to less than 160 cubic feet. They are ok for cover.
|
INSP-Sprinkler Rough-in/Hydro | 11/20/2017 | 11/20/2017 | 11/20/2017 | P | PASS |
Troy Cobbley
|
|
|
24 hour air test on the dry system passed
|
INSP-Sprinkler Rough-in/Hydro | 11/16/2017 | 11/16/2017 | 11/16/2017 | P | PART |
Troy Cobbley
|
|
|
24 hour air test started at 9:00am with 43psi on guage.
|
INSP-Sprinkler Rough-in/Hydro | 11/15/2017 | 11/16/2017 | 11/15/2017 | A | PASS |
Troy Cobbley
|
|
|
Overhead rough-in and hydro test passed. I need verification that the air compressor is ok and the outside combustible canopies are meet NFPA 13 8.15.7
tom Phone #: ###-####
|
INSP-Supply line flush | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line flush passed
|
Sprinkler Plan Check | 8/23/2017 | | 8/23/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/23/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/23/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2017 | | 8/23/2017 | | DONE |
Brittany Hill
|
|
|
|
Sprinkler Plan Check | 8/21/2017 | | 8/21/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/21/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/21/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 8/16/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/16/2017 | | 8/16/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/10/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 10 2017 1:11PM
|