Permit Information
Permit NumberFIR17-00433
StatusFinaled
Name PHOENIX FIRE PROTECTION
Site Address 7997 W FRANKLIN RD
Project NameLonghorn Steakhouse
Customer Number 
ePlanReviewYes
Description
[Longhorn Steakhouse]
New one level 5,593 Sq Ft Bldg to be fully sprinklered per NFPA 13, 2013, occupancy class A-2, construction type V B, Underground submitted - Permit #FIR17-00365
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection12/7/201712/8/201712/8/2017APASS
DetailsTroy Cobbley
Permit finaled

Contact Scotty Powada ###-#### 30 min prior to Fire Final Insp start please.

Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
INSP-Final Inspection12/7/201712/7/201712/7/2017AFAIL
DetailsTroy Cobbley
Need sticker for the bell and forward flow flush. Also will need test papers. Unit heaters have been installed in the wet system spaces in the attic above the main roof with temp. sensors.
INSP-Sprinkler Rough-in/Hydro11/28/201711/29/201711/29/2017APASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Sprinkler Rough-in/Hydro11/27/201711/28/201711/28/2017AFAIL
DetailsTroy Cobbley
Overhead hydro test failed due to a leaky drain valve.
INSP-Sprinkler Rough-in11/27/201711/27/201711/27/2017PPASS
DetailsTroy Cobbley
The sprinkler piping above the lay-in ceiling tile is ok to cover.
INSP-Sprinkler Rough-in11/2/201711/2/201711/2/2017PPART
DetailsTroy Cobbley
Todays inspection was for the sprinkler piping located in the combustible concealed spaces located on the roof. I was unable to get access to the areas where the dry sprig-ups have been installed. The other areas where the piping is installed I was able to inspect and found that one seismic restraint is needed. But the bigger issue is that all of this piping is supplied from the wet system and the areas where it is installed in unheated. Means to heat these areas are needed as per NFPA 13 or a dry pipe system may be required also per NFPA 13.
Plan Modification Accepted  11/1/2017 DONE
Plan assigned to (Tim)11/1/2017 11/1/2017 DONE
DetailsTim Frost
Sprinkler Plan Check11/1/2017 11/1/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/1/2017 DONE
Permit Ready to Issue  11/1/2017 DONE
PLEASE DO NOT RE ISSUE
CHANGE STATUS TO (ISS)  11/1/2017 DONE
(F) Reprint permit  11/1/2017 DONE
INSP-Sprinkler Rough-in10/30/201710/31/201710/31/2017PCANC
DetailsTroy Cobbley
Contact Scott Powada - ###-#### 30 Min Prior to RTC insp Start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in10/30/201710/30/201710/30/2017PFAIL
DetailsTroy Cobbley
No access to roof and the plans do not show the dry sprig ups into the combustible concealed space.
INSP-Sprinkler Rough-in/Hydro10/16/201710/17/201710/16/2017ACANC
DetailsTroy Cobbley
Contact Scott Powada ###-#### 30 min prior to Hydro insp start please

Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Sprinkler Rough-in/Hydro10/11/201710/13/201710/13/2017ACANC
DetailsTroy Cobbley
Contact Scott Powada ###-#### 30 min prior to hydro please


Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
INSP-Supply line flush10/11/201710/12/201710/12/2017PCANC
DetailsTroy Cobbley
Wrong permit number called in
INSP-Sprinkler Rough-in10/11/201710/12/201710/12/2017APASS
DetailsTroy Cobbley
The earth quake bracing has been corrected. The branchline siesmic restraints have been added and the east facing extended coverage dry sidewall has been piped. Lower level piping can be covered except where the piping penatrates out to the front entry canopy
Intake Approval  10/11/2017 PASS
Plan assigned to (Tim)10/11/2017 10/11/2017 DONE
DetailsTim Frost
Sprinkler Plan Check10/11/2017 10/11/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/11/2017 DONE
Permit Ready to Issue  10/11/2017 DONE
DO NOT RE ISSUE- PLAN MOD (no fee pre Tim Frost)
CHANGE STATUS TO (ISS)  10/11/2017 DONE
(F) Reprint permit  10/11/2017 DONE
INSP-Sprinkler Rough-in10/6/201710/6/201710/6/2017PPART
DetailsTroy Cobbley
Rough-in passed for the lower level except the earthquake bracing needs to be possibly modified as discussed and siesmic bracing for the branchlines added. The sidewall heads, cooler heads and all of the upper/roof level heads have not been installed yet. No small documents were provided just the plans/piping layout. Riser is not built yet.
Sprinkler Plan Check9/25/2017 9/25/2017 FAIL
DetailsTim Frost
Miscellaneous action  9/25/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Case Summary  9/25/2017 DONE
DetailsTroy Cobbley
Troy informed contractor on the job site that no work was to be done until the permit was ready to be picked up. Sprinkler permit is still under review.RAD
Sprinkler Plan Check9/25/2017 9/25/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  9/25/2017 DONE
DetailsTim Frost
Permit Ready to Issue  9/25/2017 DONE
DetailsChristina Prado
All requirements met
Issue and Print Permit  9/25/2017 DONE
Sprinkler Plan Check9/20/2017 9/20/2017 FAIL
DetailsTim Frost
Miscellaneous action  9/20/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Intake Approval  8/11/2017 PASS
Plan assigned to (Tim)8/11/2017 8/11/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/11/2017 8/11/2017 FAIL
DetailsTim Frost
1st review completed  8/11/2017 FAIL
DetailsTim Frost
Miscellaneous action  8/11/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  8/10/2017 DONE
Application submitted via PDS Online on Aug 10 2017 3:07PM