INSP-Final Inspection | 12/7/2017 | 12/8/2017 | 12/8/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Contact Scotty Powada ###-#### 30 min prior to Fire Final Insp start please.
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 12/7/2017 | 12/7/2017 | 12/7/2017 | A | FAIL |
Troy Cobbley
|
|
|
Need sticker for the bell and forward flow flush. Also will need test papers. Unit heaters have been installed in the wet system spaces in the attic above the main roof with temp. sensors.
|
INSP-Sprinkler Rough-in/Hydro | 11/28/2017 | 11/29/2017 | 11/29/2017 | A | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Sprinkler Rough-in/Hydro | 11/27/2017 | 11/28/2017 | 11/28/2017 | A | FAIL |
Troy Cobbley
|
|
|
Overhead hydro test failed due to a leaky drain valve.
|
INSP-Sprinkler Rough-in | 11/27/2017 | 11/27/2017 | 11/27/2017 | P | PASS |
Troy Cobbley
|
|
|
The sprinkler piping above the lay-in ceiling tile is ok to cover.
|
INSP-Sprinkler Rough-in | 11/2/2017 | 11/2/2017 | 11/2/2017 | P | PART |
Troy Cobbley
|
|
|
Todays inspection was for the sprinkler piping located in the combustible concealed spaces located on the roof. I was unable to get access to the areas where the dry sprig-ups have been installed. The other areas where the piping is installed I was able to inspect and found that one seismic restraint is needed. But the bigger issue is that all of this piping is supplied from the wet system and the areas where it is installed in unheated. Means to heat these areas are needed as per NFPA 13 or a dry pipe system may be required also per NFPA 13.
|
Plan Modification Accepted | | | 11/1/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 11/1/2017 | | 11/1/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/1/2017 | | 11/1/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/1/2017 | | DONE |
|
|
|
PLEASE DO NOT RE ISSUE
|
CHANGE STATUS TO (ISS) | | | 11/1/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/1/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 10/30/2017 | 10/31/2017 | 10/31/2017 | P | CANC |
Troy Cobbley
|
|
|
Contact Scott Powada - ###-#### 30 Min Prior to RTC insp Start please
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in | 10/30/2017 | 10/30/2017 | 10/30/2017 | P | FAIL |
Troy Cobbley
|
|
|
No access to roof and the plans do not show the dry sprig ups into the combustible concealed space.
|
INSP-Sprinkler Rough-in/Hydro | 10/16/2017 | 10/17/2017 | 10/16/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact Scott Powada ###-#### 30 min prior to Hydro insp start please
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Sprinkler Rough-in/Hydro | 10/11/2017 | 10/13/2017 | 10/13/2017 | A | CANC |
Troy Cobbley
|
|
|
Contact Scott Powada ###-#### 30 min prior to hydro please
Thank YOU Phone #: ###-#### >> Inspection requested via web by Teri Cruickshank Inspection cancelled from web by: Teri Cruickshank
|
INSP-Supply line flush | 10/11/2017 | 10/12/2017 | 10/12/2017 | P | CANC |
Troy Cobbley
|
|
|
Wrong permit number called in
|
INSP-Sprinkler Rough-in | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Troy Cobbley
|
|
|
The earth quake bracing has been corrected. The branchline siesmic restraints have been added and the east facing extended coverage dry sidewall has been piped. Lower level piping can be covered except where the piping penatrates out to the front entry canopy
|
Intake Approval | | | 10/11/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/11/2017 | | 10/11/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/11/2017 | | 10/11/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/11/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/11/2017 | | DONE |
|
|
|
DO NOT RE ISSUE- PLAN MOD (no fee pre Tim Frost)
|
CHANGE STATUS TO (ISS) | | | 10/11/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 10/11/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed for the lower level except the earthquake bracing needs to be possibly modified as discussed and siesmic bracing for the branchlines added. The sidewall heads, cooler heads and all of the upper/roof level heads have not been installed yet. No small documents were provided just the plans/piping layout. Riser is not built yet.
|
Sprinkler Plan Check | 9/25/2017 | | 9/25/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/25/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Case Summary | | | 9/25/2017 | | DONE |
Troy Cobbley
|
|
|
Troy informed contractor on the job site that no work was to be done until the permit was ready to be picked up. Sprinkler permit is still under review.RAD
|
Sprinkler Plan Check | 9/25/2017 | | 9/25/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/25/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/25/2017 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Issue and Print Permit | | | 9/25/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/20/2017 | | 9/20/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 9/20/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 8/11/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/11/2017 | | 8/11/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/11/2017 | | 8/11/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 8/11/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 8/11/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 8/10/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 10 2017 3:07PM
|