Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberFIR17-00441
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 1381 S BIRD ST
Project NameCimarron Duplex 13D
Customer Number 
ePlanReviewYes
Description
[Cimarron Duplex Building #15]
The fire sprinkler scope of work consists of a single level two-unit apartment building protected with a NFPA 13R systems. There is a dedicated 2”x64’± poly pipe fire protection underground. All above ground piping is CPVC.

Plan Mod #1 - 2/07/2018
Complete redesign to a NFPA 13R system.
[BLD17-02429]
The building permit plan review is not complete at this time.

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection5/29/20185/30/20185/30/2018APASS
DetailsTroy Cobbley
Permit finaled


John will be there at 7:00am would like to start as soon as possible. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in3/19/20183/19/20183/19/2018PPASS
DetailsTroy Cobbley
Rough-in and tenting passed. Piping can be covered.
INSP-Sprinkler Rough-in/Hydro3/14/20183/14/20183/14/2018PPASS
DetailsTroy Cobbley
Overhead hydro test passed
INSP-Supply line flush3/9/20183/12/20183/12/2018APASS
DetailsScott Arellano
Flush wItnessed
(F) Reprint permit  2/8/2018 DONE
CHANGE STATUS TO (ISS)  2/8/2018 DONE
Plan Modification Accepted  2/7/2018 DONE
Plan assigned to (Tim)2/7/2018 2/7/2018 DONE
DetailsTim Frost
Sprinkler Plan Check2/7/2018 2/7/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/7/2018 DONE
Permit Ready to Issue  2/7/2018 DONE
PLAN MOD
INSP-Sprinkler Rough-in2/6/20182/6/20182/6/2018PPASS
DetailsTroy Cobbley
The underground supply line is ok for cover.
Permit Ready to Issue  8/18/2017 DONE
Issue and Print Permit  8/18/2017 DONE
Inspection Record Card- Fire8/18/2017 8/18/2017 DONE
DetailsChristina Prado
Sprinkler Plan Check8/17/2017 8/17/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/17/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/17/2017 DONE
DetailsTim Frost
Permit Ready to Issue  8/17/2017 DONE
Application received  8/16/2017 DONE
Application submitted via PDS Online on Aug 16 2017 11:01AM
Intake Approval  8/16/2017 PASS
Plan assigned to (Tim)8/16/2017 8/16/2017 DONE
DetailsTim Frost