INSP-Final Inspection | 6/27/2018 | 6/28/2018 | 6/28/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 4/9/2018 | 4/9/2018 | 4/9/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping/tenting complete, approved for cover.
|
INSP-Sprinkler Rough-in/Hydro | 3/21/2018 | 3/21/2018 | 3/21/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed inspection
John Phone #: ###-####
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PASS |
Scott Arellano
|
|
|
Flush wItnessed
|
INSP-Sprinkler Rough-in | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground supply line is ok for cover.
|
Plan Modification Accepted | | | 1/22/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 1/22/2018 | | 1/22/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/22/2018 | | 1/22/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/22/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/22/2018 | | DONE |
Christina Prado
|
|
|
Plan Mod fees due, change status to ISS once paid in full
|
CHANGE STATUS TO (ISS) | | | 1/22/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 8/18/2017 | | 8/18/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/18/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/18/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/18/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/18/2017 | | 8/18/2017 | | DONE |
Brittany Hill
|
|
|
|
Intake Approval | | | 8/17/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/17/2017 | | 8/17/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/16/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 16 2017 11:07AM
|