INSP-Final Inspection | 5/15/2018 | 5/17/2018 | 5/17/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
First thing in the morning if possible thanks. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground flush passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | FAIL |
Scott Arellano
|
|
|
Flush could not be performed because domestic water was inadvertantly connected. Flush to be rescheduled.
|
INSP-Sprinkler Rough-in | 2/28/2018 | 3/1/2018 | 3/1/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in and tenting passed. Piping can be covered.
Late morning if possible Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 12/14/2017 | 12/14/2017 | 12/14/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
(F) Reprint permit | | | 8/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2017 | | 8/23/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/18/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/18/2017 | | 8/18/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/18/2017 | | 8/18/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/18/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/18/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 8/18/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/18/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/18/2017 | | 8/18/2017 | | DONE |
Brittany Hill
|
|
|
|
Application received | | | 8/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2017 12:25PM
|