INSP-Final Inspection | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PASS |
Scott Arellano
|
|
|
Flush wItnessed
|
INSP-Sprinkler Rough-in | 2/1/2018 | 2/1/2018 | 2/1/2018 | P | PASS |
Troy Cobbley
|
|
|
Underground Inspection passed. Piping can be covered.
|
Fees Due Hold | 1/20/2018 | | 2/1/2018 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 1/19/2018 | 1/19/2018 | 1/19/2018 | P | PASS |
Troy Cobbley
|
|
|
Tenting passed. Piping can be covered
|
INSP-Sprinkler Rough-in | 1/18/2018 | 1/19/2018 | 1/19/2018 | A | FAIL |
Troy Cobbley
|
|
|
Tenting failed again. It still is not attached. A re-inspection fee has been applied.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in | 1/18/2018 | 1/18/2018 | 1/18/2018 | P | PART |
Troy Cobbley
|
|
|
Rough-in passed but the tenting inspection failed. Piping can not be covered.
|
Permit Ready to Issue | | | 8/23/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2017 | | 8/23/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/22/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/22/2017 | | 8/22/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/22/2017 | | 8/22/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/22/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2017 12:49PM
|