INSP-Final Inspection | 5/17/2018 | 5/18/2018 | 5/18/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Call Mike prior to heading out. Would like to do it as early as possible. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Final Inspection | 5/15/2018 | 5/17/2018 | 5/17/2018 | A | FAIL |
Troy Cobbley
|
|
|
Display was not set up, I called mike when I was back in the area but could only leave a message. Will need to reschedule.
First thing in the morning if possible thanks. Phone #: ###-#### Inspection requested via web by Sam Ball
|
INSP-Sprinkler Rough-in/Hydro | 3/14/2018 | 3/14/2018 | 3/14/2018 | P | PASS |
Troy Cobbley
|
|
|
Overhead hydro test passed
|
INSP-Supply line flush | 3/9/2018 | 3/12/2018 | 3/12/2018 | A | PASS |
Scott Arellano
|
|
|
Flush wItnessed
|
INSP-Sprinkler Rough-in | 2/19/2018 | 2/20/2018 | 2/20/2018 | A | PASS |
Troy Cobbley
|
|
|
Tenting and pipe rough-in passed. Piping can be covered.
|
INSP-Sprinkler Rough-in | 1/15/2018 | 1/16/2018 | 1/16/2018 | A | PASS |
Troy Cobbley
|
|
|
Underground supply line approved for cover.
Phone #: ###-#### Inspection requested via web by Sam Ball
|
Permit Ready to Issue | | | 8/23/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 8/23/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 8/23/2017 | | 8/23/2017 | | DONE |
Christina Prado
|
|
|
|
Intake Approval | | | 8/22/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 8/22/2017 | | 8/22/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 8/22/2017 | | 8/22/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 8/22/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 8/22/2017 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 8/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 17 2017 12:52PM
|