Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR17-00461
StatusFinaled
Name ABSOLUTE FIRE PROTECTION
Site Address 1351 S BIRD ST
Project NameCimarron 4 plex bldg #19
Customer Number 
ePlanReviewYes
Description
[Cimarron Apartments 4 Plex Building #19]
The fire sprinkler scope of work consists of protecting a four plex per NFPA 13R. The majority of the piping is CPVC.

Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
[BLD17-02425]
The building permit plan review is not complete at this time.

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/11/20184/12/20184/12/2018APASS
DetailsTroy Cobbley
Permit finaled

Call 30 minuets prior to arrival Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection4/10/20184/11/20184/11/2018AFAIL
DetailsTroy Cobbley
The sprinkler heads in the second floor mechanical rooms still had the shipping caps on and appeared they may need height adjustment to fit the canopies. The fire riser devices have been tested.

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Final Inspection4/5/20184/6/20184/6/2018PCANC
DetailsTroy Cobbley
Unable to test the sprinkler devices due to fire alarm issues. Contractor needs to verify that the shipping clips have been removed from heads.
INSP-Sprinkler Rough-in/Hydro3/9/20183/9/20183/9/2018PPASS
DetailsTroy Cobbley
overhead hydro test passed

Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Supply line flush2/13/20182/14/20182/14/2018PDONE
DetailsJim Page
Undergorund main line flush complete.
INSP-Sprinkler Rough-in12/27/201712/28/201712/28/2017APASS
DetailsTroy Cobbley
Tenting and pipe rough-in passed. Piping can be covered

. Phone #: ###-#### Inspection requested via web by Sam Ball
INSP-Sprinkler Rough-in12/14/201712/14/201712/14/2017PPASS
DetailsJim Page
Rough to cover inspection for underground supply complete, approved for cover.
Issue and Print Permit  8/23/2017 DONE
Inspection Record Card- Fire8/23/2017 8/23/2017 DONE
DetailsChristina Prado
Intake Approval  8/22/2017 PASS
Plan assigned to (Tim)8/22/2017 8/22/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/22/2017 8/22/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/22/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/22/2017 DONE
DetailsTim Frost
Permit Ready to Issue  8/22/2017 DONE
Application received  8/17/2017 DONE
Application submitted via PDS Online on Aug 17 2017 1:11PM