Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR17-00468
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6610 S ELITE DR
Project NameFedEx Ground Boise
Customer Number 
ePlanReviewYes
Description
[FedEx Ground Boise]
The fire sprinkler scope of work consists of connecting to the two previously installed dedicated 6" underground fire service feeds and install two new backflows to accommodate the five new wet systems to protect the new approximately 234,857 square foot FedEx distribution building. The five new systems shall utilize standard spray 8.0k upright and 5.6k pendant sprinklers supplied by new grid systems with 4" feed mains, 1½" branch lines and a 2½ secondary main, with all associated required valves to protect the new building according to NFPA 13 for light and ordinary hazards.

*** FIELD INSPECTOR ***
The warehouse space is supposed to have conveyors. There are no conveyors shown in the drawing. The conveyors will undoubtedly cause obstruction issued. Therefore, this warehouse space is NOT approved for occupancy at this time. A complete resubmittal with all of the conveyors shown in the drawings is required prior to occupancy.

• The underground piping is under permit FIR17-0042

[BLD17-01018]
This is an unlimited area building with 60-foot yards all the way around. New package distribution center. Conveyor equipment and racking permit to be submitted separately. Scope of permit- full build out of 234,857 distribution center. Work to include plumbing, mechanical, electrical, fire sprinkler and fire alarm system. Interior nonbearing partition walls to create accessory office area, accessible restrooms and finish material. Core and shell constructed under BLD17-00563 and GRD17-0013. This building is fully fire sprinklered. **ajs**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/12/20186/13/20186/13/2018APASS
DetailsJim Page
Final fire sprinkler inspection complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Final Inspection5/30/20186/4/20186/4/2018PCANC
DetailsJim Page
Could not complete final for fire sprinklers due to fire alarm issues. Final inspection will be rescheduled for a later date.

Mike Bierman is the contact for this final inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in/Hydro5/21/20185/22/20185/22/2018ADONE
DetailsJim Page
Hydrostatic test for overhead fire sprinkler piping on system 5 complete witnessed, no pressure loss observed at riser proveded gauge.

Mike Bierman is the contact for this inspection. If he is not able to be reached, call Jon Beazer at ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Conference4/16/20184/16/20184/16/2018PDONE
DetailsJim Page
Fire sprinkler conference complete.
INSP-Sprinkler Rough-in/Hydro1/22/20181/23/20181/23/2018APASS
DetailsTroy Cobbley
Todays inspection was just overhead hydro test for wet systems 1, 2, 3 and 4. The all passed.
Sprinkler Plan Check8/28/2017 8/28/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/28/2017 DONE
DetailsTim Frost
Permit Ready to Issue  8/28/2017 DONE
Issue and Print Permit  8/28/2017 DONE
Inspection Record Card- Fire8/28/2017 8/28/2017 DONE
DetailsTisha Gallop
Intake Approval  8/23/2017 PASS
Plan assigned to (Tim)8/23/2017 8/23/2017 DONE
DetailsTim Frost
Application received  8/21/2017 DONE
Application submitted via PDS Online on Aug 21 2017 10:09AM