Permit Information
Permit NumberFIR17-00473
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 6360 S FEDERAL WAY
Project NameMicron Boise
Customer Number 
ePlanReviewYes
Description
[Micron Boise]
The fire sprinkler scope of work consists of adding, plugging and relocating sprinklers to accommodate new wall and ceiling configuration.
Contractor’s Note:
The building permit has not been issued at this time. The building department may determine that changes are required to the building plans in order to meet code. The changes may affect the sprinkler system. The sprinkler contractor will be obligated to make all necessary changes that may be required. Therefore, if the sprinkler contractor chooses to proceed without an issued building permit, they will do so on their own cognizance. This note does not constitute an early start agreement.
[BLD17-02710]
Tenant improvement to existing 69,464 sq ft two-story office building. Improvements include adding new offices, meeting and fitness rooms; new ceilings; new floor and wall finishes; new mechanical, plumbing and electrical units and fixtures. No site or exterior work is included. This building is fully fire sprinklered with an approved fire alarm system. Separate permits will be required prior to modifications to the building fire protection systems; as regulated by the Fire Department.
Alternative Materials and Methods:
• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/6/201711/7/201711/7/2017APASS
DetailsJim Page
Final fire sprinkler inspection passed/complete.
INSP-Sprinkler Rough-in10/26/201710/27/201710/27/2017APASS
DetailsTroy Cobbley
See the city approved plans for locations marked with todays date where sprinkler piping is ok for cover.
INSP-Sprinkler Rough-in10/25/201710/25/201710/25/2017PPART
DetailsJim Page
Partial rough to cover inspection complete for level 2, notated city approved plans with green highlighter/red ink areas inspected today and approved for cover.
INSP-Sprinkler Rough-in10/25/201710/25/201710/25/2017PCANC
DetailsJim Page
Mark Jensen is the contact for this inspection. Thank you. Phone #: ###-#### >> Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
INSP-Sprinkler Rough-in10/23/201710/24/201710/24/2017APART
DetailsJim Page
Partial rough to ocver inspection for level 2, notated the city approved drawings with pink highlighter/red ink areas approved for cover.
INSP-Sprinkler Rough-in10/18/201710/19/201710/19/2017APART
DetailsJim Page
Partial rough to cover inspection complete for level 2, notated the city approved drawings with yellow highlighter/red ink areas approved for cover.
INSP-Sprinkler Rough-in10/17/201710/18/201710/18/2017APART
DetailsJim Page
Rough to cover inspection complete for level 1, noted the city approved drawings with yellow highlighter/red ink areas approved for cover.
INSP-Sprinkler Rough-in10/10/201710/11/201710/11/2017PPART
DetailsJim Page
Partial rough to cover inspection for overhead fire sprinkler piping complete, notated the city approved drawings with pink highlighter and red ink areas approved for cover.
Sprinkler Plan Check8/25/2017 8/25/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  8/25/2017 DONE
DetailsTim Frost
Permit Ready to Issue  8/25/2017 DONE
DetailsChristina Prado
All requirements met
Issue and Print Permit  8/25/2017 DONE
Inspection Record Card- Fire8/25/2017 8/25/2017 DONE
DetailsChristina Prado
Intake Approval  8/24/2017 PASS
Plan assigned to (Tim)8/24/2017 8/24/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/24/2017 8/24/2017 FAIL
DetailsTim Frost
1st review completed  8/24/2017 FAIL
DetailsTim Frost
Miscellaneous action  8/24/2017 DONE
DetailsTim Frost
Emailed contractor in regards to failed review.
Application received  8/23/2017 DONE
Application submitted via PDS Online on Aug 23 2017 4:17PM