Miscellaneous action | | | 5/25/2018 | | DONE |
|
|
|
Emailed Crane to request an update on the proposed plan modification that was discussed 11/7/17.
|
Miscellaneous action | | | 5/25/2018 | | DONE |
|
|
|
Received and reviewed as built drawings from Mary.
|
INSP-Final Inspection | 11/2/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
Telephone call | | | 11/7/2017 | | DONE |
|
|
|
Natalie called to say there are some changes that need to be resubmitted as a plan mod and needs the work flow opened.
|
Miscellaneous action | | | 10/19/2017 | | DONE |
|
|
|
Mary called to say that some duct smoke detectors did not need to be installed. I informed her that as built drawings will need to be sent prior to inspection and that she will need to have original stamped drawings and as built drawings on site at the time of inspection.
|
Issue and Print Permit | | | 9/5/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/5/2017 | | 9/5/2017 | | DONE |
Tisha Gallop
|
|
|
|
1st review completed | | | 9/1/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 9/1/2017 | | 9/1/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 9/1/2017 | | DONE |
|
|
|
Plans approved with review comments and drawing notation.
|
Permit Ready to Issue | | | 9/1/2017 | | DONE |
|
|
|
all met
|
Miscellaneous action | | | 9/1/2017 | | DONE |
|
|
|
Emailed John to remind him that a document cabinet will be required.
|
Plan assigned to (Lee) | 8/28/2017 | | 8/28/2017 | | DONE |
Lee G Meredith
|
|
|
|
Miscellaneous action | | | 8/28/2017 | | DONE |
|
|
|
Emailed John questions regarding partial office notification and whether this was designed by a professional engineer. John responded to say the to indicate that offices with multiple occupants are shown with notification and that a P.E was not involved in the design.
|
Application received | | | 8/25/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Aug 25 2017 2:55PM
|