Description
[(HYBRID EVOR – ST. ALPHONSUS – 2ND STORY – BELOW CENTRAL TOWER] - Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

[BLD17-01166]
The fire sprinkler system is used for high-rise and for occupancy. To remodel three areas on the 2nd story having a total floor area of about 2,043 square feet to be used as an endovascular operating room (EVOR), anesthesia supply and work room, and anesthesia offices. Work is to include interior noncombustible nonbearing walls, lead shielding, suspended acoustical ceiling, gypsum board ceiling, medical equipment, a floor bearing plate to support medical equipment, overhead structural support grid for medical equipment (horizontal Unistrut for gravity loads, vertical Unistrut for gravity loads, and diagonal Unistrut braces for seismic loads), new doors, counters, cabinets, and finishes. While transporting the new medical equipment through the building and while staging for installation, floors and elevators are not allowed to be overloaded. Special Inspection is required for welding, for bolting, and for post installed anchors in hardened concrete. The installation and use of X-ray equipment, including shielding at new and existing walls, is required to comply with all applicable Industry, State, and Federal regulations. The work is required to comply with the approved drawings, with the structural design, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 (including the installation of quick-response fire sprinkler heads within altered areas) and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. Separate fire sprinkler permits and fire alarm permits shall be obtained prior to beginning any modification or installation work on such systems. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/8/20183/9/20183/9/2018APASS
DetailsTroy Cobbley
permit finaled

Rick Phone #: ###-####
INSP-Final Inspection3/2/20183/2/20183/2/2018PCANC
DetailsTroy Cobbley
RCIK FRY IS OUR CONTACT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
INSP-Sprinkler Rough-in1/4/20181/5/20181/5/2018APART
DetailsTroy Cobbley
Sprinkler piping in Rooms 200 and 208 is ok to cover but the pendant head in the Electrical Closet is overspaced.

cecil Phone #: ###-####
INSP-Sprinkler Rough-in12/15/201712/18/201712/18/2017APASS
DetailsTroy Cobbley
Rough-in complete in Rooms 209 and 210. Piping can be covered.
INSP-Sprinkler Rough-in11/29/201711/30/201711/30/2017APASS
DetailsTroy Cobbley
The sprinkler piping in the new OR room is ok to cover.
INSP-Final Inspection11/16/201711/17/201711/17/2017APART
DetailsTroy Cobbley
Work is complete in the two Anesthsia Rooms.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in10/18/201710/18/201710/18/2017PPART
DetailsTroy Cobbley
See the city approved plans for the two rooms where piping is ok to cover. An additional head is needed in the Storage room as shown on the plans.

Rick Phone #: ###-####
Intake Approval  8/29/2017 PASS
Plan assigned to (Tim)8/29/2017 8/29/2017 DONE
DetailsTim Frost
Sprinkler Plan Check8/29/2017 8/29/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  8/29/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  8/29/2017 DONE
DetailsTim Frost
Permit Ready to Issue  8/29/2017 DONE
all met
Issue and Print Permit  8/29/2017 DONE
Inspection Record Card- Fire8/29/2017 8/29/2017 DONE
DetailsTiffany Carson-Herker
Application received  8/28/2017 DONE
Application submitted via PDS Online on Aug 28 2017 11:05AM