Permit Information
Permit NumberFIR17-00502
StatusFinaled
Name TRIBAL FIRE SYSTEMS
Site Address 8000 S FEDERAL WAY
Project NameMicron Bldg 39 CUP Underground
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Micron Building 39 Central Utility Plant 3 - C29420 - UDG Only] - Quick Permit
Fire sprinkler underground to flange.

[BLD17-00502]
The CUP 3 building (B39) will be located south of the new B51 R & D Expansion Project. This permit is for STRUCTURAL ONLY FOR BUILDING AND UTILITY TRESTLE FOOTINGS, FOUNDATIONS AND STRUCTURAL STEEL COMPONENTS OF THE TOTAL DESIGN. The proposed new CUP B39 consists of an estimated gross footprint of 68,000 square feet of Type IIB construction. Building occupancy is anticipated to be a mixture of H4 and F1. Special inspections are required.

Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection4/12/20194/12/20194/12/2019PPASS
DetailsJim Page
Underground supply permit finaled.

Clarence Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro6/15/20186/18/20186/18/2018PDONE
DetailsJim Page
Underground supply hydrostatic test witnessed, no pressure loss obsrved at riser provided gauge.

Please Call Chris Ford Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Supply line flush5/8/20185/10/20185/10/2018ADONE
DetailsJim Page
Underground main line flush complete.

Phone #: ###-#### Inspection requested via web by Jessia Maxwell
INSP-Sprinkler Rough-in10/3/201710/3/201710/3/2017PPART
DetailsJim Page
Partial rough to cover inspection for underground supply complete, riser and approximately 12 feet of pipe stubbed out from building inspected, area inspected approved for cover, remaining underground supply to be inspected at a later date.
INSP-Sprinkler Rough-in9/27/20179/28/20179/28/2017PCANC
DetailsJim Page
Call Chris. Rough-In for underground feed. Phone #: ###-#### >> Inspection requested via web by Sheldon Gray Inspection cancelled from web by: Sheldon Gray
Fees Due Hold9/2/2017 9/27/2017 DONE
DetailsChristina Prado
Intake Approval  9/1/2017 PASS
Plan assigned to (Tim)9/1/2017 9/1/2017 DONE
DetailsTim Frost
Sprinkler Plan Check9/1/2017 9/1/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  9/1/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/1/2017 DONE
DetailsTim Frost
Permit Ready to Issue  9/1/2017 DONE
all met
Issue and Print Permit  9/1/2017 DONE
Inspection Record Card- Fire9/1/2017 9/1/2017 DONE
DetailsTiffany Carson-Herker
Application received  8/29/2017 DONE
Application submitted via PDS Online on Aug 29 2017 12:52PM