INSP-Final Inspection | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
Plan Modification Accepted | | | 9/28/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 9/28/2017 | | 9/28/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/28/2017 | | 9/28/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/28/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 9/28/2017 | | DONE |
|
|
|
DO NOT REISSUE- plan mod
|
Issue and Print Permit | | | 9/28/2017 | | DONE |
|
|
|
|
Plan Modification Accepted | | | 9/27/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/27/2017 | | 9/27/2017 | | FAIL |
Tim Frost
|
|
|
|
Plan assigned to (Tim) | 9/27/2017 | | 9/27/2017 | | DONE |
Tim Frost
|
|
|
|
INSP-Sprinkler Rough-in | 9/25/2017 | 9/26/2017 | 9/26/2017 | A | PART |
Troy Cobbley
|
|
|
The work performed appears ok and the soffit is ok to cover. But the installation does not match plans such as the added uprights and pendants. Plan modifications will be needed to verify the three heads(two uprights/one pendant) supplied by 1". Also the adjoining space fire protection work has not been completed.
MIKE OSWALD Phone #: ###-####
|
Issue and Print Permit | | | 9/6/2017 | | DONE |
|
|
|
|
Inspection Record Card- Fire | 9/6/2017 | | 9/6/2017 | | DONE |
Christina Prado
|
|
|
|
Application received | | | 9/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 5 2017 8:02AM
|
Intake Approval | | | 9/5/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/5/2017 | | 9/5/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/5/2017 | | 9/5/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 9/5/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/5/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/5/2017 | | DONE |
|
|
|
all met
|