INSP-Final Inspection | 12/20/2017 | 12/20/2017 | 12/20/2017 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
Call Anthony before heading out Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 12/4/2017 | 12/4/2017 | 12/4/2017 | P | PASS |
Troy Cobbley
|
|
|
The upright sprinklers have been added at draft stop. Piping is ok for cover.
Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
INSP-Sprinkler Rough-in | 11/27/2017 | 11/29/2017 | 11/29/2017 | P | PART |
Troy Cobbley
|
|
|
Rough-in as per the scope of work is complete but I noted additional upright sprinkler coverage is required due to a draft stop in the attic space. Piping is ok to cover but I will need access to verify the additional uprights prior to a final.
|
Plan Modification Accepted | | | 11/28/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/28/2017 | | 11/28/2017 | | PASS |
Tim Frost
|
|
|
as per Tim F-no fees for plan mod
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/28/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 11/28/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 11/28/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 9/13/2017 | | 9/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 9/13/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 9/13/2017 | | DONE |
|
|
|
all met
|
Issue and Print Permit | | | 9/13/2017 | | DONE |
|
|
|
|
Intake Approval | | | 9/11/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 9/11/2017 | | 9/11/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 9/11/2017 | | 9/11/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 9/11/2017 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 9/8/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 8 2017 9:44AM
|