INSP-Final Inspection | 4/26/2018 | 4/27/2018 | 4/27/2018 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for overhead fire sprinkler piping was completed during a past inspection, final fire sprinkler inspection for area of work complete.
|
Issue and Print Permit | | | 4/24/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 4/12/2018 | | 4/20/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 4/20/2018 | | 4/20/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 4/20/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/20/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 4/20/2018 | | DONE |
Christina Prado
|
|
|
All requirements met
|
Telephone call | | | 4/20/2018 | | DONE |
Christina Prado
|
|
|
Called Micron to advise permit is approved and ready to issue
|
Case Summary | | | 4/20/2018 | | DONE |
|
|
|
|
Plan resubmittals received | | | 4/12/2018 | | DONE |
|
|
|
resubmittal recieved 2 sets of cover sheet, FP210,FP211, FP212, FP510,FP511, FP512, checklist and calcs-took to Tim F
|
Plan assigned to (Scott) | | | 9/8/2017 | | DONE |
Scott Arellano
|
|
|
This permit was created on the web by Paul Marcolina
|
Application received | | | 9/8/2017 | | DONE |
|
|
|
This permit was created on the web by Paul Marcolina
|