Information based on query as of Wednesday, July 24, 2024.
Permit Information
Permit NumberFIR17-00531
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 10751 W OVERLAND RD
Project NameCLICK LIST T.I. IN FRED MEYER
Customer Number 
ePlanReviewYes
Description
[Fred Meyer - Online Checklist Storage] - Quick Permit
Add, plug and relocate sprinklers to accommodate new wall and ceiling configuration.

[BLD17-02496]
Permit is to remodel an existing 1,436 sq. ft. area within an existing Fred Myer retail store. Approval is contingent upon adhering to the approved plans on file. Scope of work includes: removal of select interior nonbearing wall, removal of select door/door frames, removal of select suspended acoustic ceiling, removal of select plumbing fixtures, construction of select interior nonbearing wall to create checklist storage area and a stock area, a new 104 sq. ft. cooler, select new door/door frames, a new rooftop RTU, select new suspended acoustic ceiling, relocated and new lighting fixtures, electrical work, mechanical work, plumbing work and finishes in compliance with chapter 8 of the 2012 IBC. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. JG
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/4/201710/5/201710/5/2017APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in9/22/20179/22/20179/22/2017PPASS
DetailsJim Page
Rough to cover inspection for overhead fire sprinkler piping for area of work complete, area of work approved for cover. Cooler to be installed at a later date.
Intake Approval  9/13/2017 PASS
Plan assigned to (Tim)9/13/2017 9/13/2017 DONE
DetailsTim Frost
Sprinkler Plan Check9/13/2017 9/13/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  9/13/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/13/2017 DONE
DetailsTim Frost
Permit Ready to Issue  9/13/2017 DONE
all met
Issue and Print Permit  9/13/2017 DONE
Application received  9/12/2017 DONE
Application submitted via PDS Online on Sep 12 2017 1:09PM