Permit Information
Permit NumberFIR17-00541
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 5257 W FAIRVIEW AVE
Project NameZELHAM RETROFIT
Customer Number 
ePlanReviewYes
Description
[Zelham]
The fire sprinkler scope of work consists of installing a complete automatic wet pipe fire sprinkler system throughout the 1st and 2nd floors per NFPA 13 2013 for light hazard. Work will begin at the connection to the existing underground stub in and floor controls will be added. The existing basement system will remain in place. There is an existing vault with the FDC and existing 4” underground to the building. A new 4” backflow preventer and two 4” and one 3” floor control valve assemblies will be installed. The two new top floors are designed as a grid. The existing bottom floor is designed as a tree. The concealed piping is CPVC and the exposed pipe is steel.

• BLD17-01202 is also related to this project.
• BLD17-02360 is also related to this project.

? Plan Mod #1 – 1/12/2018
Added a double interlock preaction system to the server rooms. See revised drawings. The preaction system supplies (3) rooms. One on the first floor and two on the second floor. A total of six sprinkles.

*** FIELD INSPECTOR ***
Do NOT final this permit. A detection system for the server room is required to be submitted, approved and tested prior to the final.

[BLD17-01548]
This building does not have a fire sprinkler system. Interior nonstructural demolition was done under permit BLD17-01202. To remodel the entire 13,988 square foot 1st story of an existing two story building which includes five areas (1) 5,600 square foot office tenant space with 56 OL in the East end of the building, (2) 2,604 square foot office tenant space with 26 OL in the Northwest corner of the building, (3) 1,653 square foot shell tenant space with 17 OL in the Southwest corner of the building, (4) 793 square foot fitness room / break room / server with 27 OL, and (5) 523 square foot shared conference room with 35 OL. Work is to include interior nonbearing walls, 2 toilet rooms accessible to the disabled, a toilet / shower room accessible to the disabled, tunneled 1-hr fire-resistive-rated corridor enclosure with 20 minute doors and 45 minute windows and smoke dampers, interior doors, interior windows, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. A fire alarm permit shall be obtained prior to beginning any modification or installation work on such systems. **CJW**

Alternative Materials and Methods:

• There are no AMM at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection3/30/20184/2/20184/2/2018APASS
DetailsTroy Cobbley
permit finaled

RICK FRY Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Final Inspection3/29/20183/30/20183/30/2018ACANC
DetailsTroy Cobbley
Unable to test the system due to fire alarm interface issues.


RICK FRY Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Final Inspection3/14/20183/15/20183/15/2018APART
DetailsTroy Cobbley
I verified the basement wet system tamper switches functioned/reported and I also verifed that the forward flush test passed

Rick Fry Phone #: ###-#### Inspection requested via web by Nathan Stenquist
INSP-Final Inspection2/28/20183/1/20182/28/2018ACANC
DetailsTroy Cobbley
Fire final for 10 AM. Rick Fry Phone #: ###-#### >> Inspection requested via web by Nathan Stenquist Inspection cancelled from web by: Nathan Stenquist
Plan Modification Accepted  2/8/2018 DONE
Plan assigned to (Tim)2/8/2018 2/8/2018 DONE
DetailsTim Frost
Sprinkler Plan Check2/8/2018 2/8/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  2/8/2018 DONE
Permit Ready to Issue  2/8/2018 DONE
waiting to see if fees are due for the plan mod-called Tim F-please do not re issue
CHANGE STATUS TO (ISS)  2/8/2018 DONE
as per Tim F no fees due for the plan mod
(F) Reprint permit  2/8/2018 DONE
INSP-Sprinkler Rough-in/Hydro2/5/20182/6/20182/6/2018APASS
DetailsTroy Cobbley
The second floor and pre-action system 200lb hydro tests passed.
INSP-Sprinkler Rough-in1/31/20182/1/20182/1/2018APASS
DetailsTroy Cobbley
24 hour air test passed. The remaining second floor piping rough-in passed. Piping can be covered. Plan Mod needed showing pipe routing changes for 3" mains and Pre-action system.
INSP-Sprinkler Rough-in1/31/20181/31/20181/31/2018PPART
DetailsTroy Cobbley
24 hour air test started at 9:00am with 51psi on the guage
INSP-Sprinkler Rough-in1/18/20181/19/20181/19/2018APASS
DetailsTroy Cobbley
See the revised city approved plans for the area on the 2nd floor where the piping can be covered. I noted one missing EQ brace.

Nathan Stenquist. RI INSP for the second floor East side. Phone #: ###-#### Inspection requested via web by Nathan Stenquist
Plan Modification Accepted  1/12/2018 DONE
Miscellaneous action  1/12/2018 PEND
*** FIELD INSPECTOR ***
Do NOT final this permit. A detection system for the server room is required to be submitted, approved and tested prior to the final. See revised drawings. The preaction system supplies (3) rooms. One on the first floor and two on the second floor. A total of six sprinkles.
Sprinkler Plan Check1/12/2018 1/12/2018 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  1/12/2018 DONE
DetailsTim Frost
Permit Ready to Issue  1/12/2018 DONE
Plan Mod Approved
DO NOT REISSUE
Issue and Print Permit  1/12/2018  
(F) Reprint permit  1/12/2018 DONE
INSP-Sprinkler Rough-in/Hydro12/13/201712/13/201712/13/2017PPASS
DetailsTroy Cobbley
OH hydro for the first floor passed
INSP-Sprinkler Rough-in12/5/201712/5/201712/5/2017PPASS
DetailsTroy Cobbley
The corrections for the piping on the previous inspection have been performed and the piping can be covered.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in11/22/201711/22/201711/22/2017PPASS
DetailsTroy Cobbley
See the city approved plans for locations inspected today where the rough-in was passed. I noted missing siesmic bracing for the branchlines, one missing lateral main bracing and one pendant head overspaced.

Rick Phone #: ###-####
INSP-Sprinkler Rough-in/Hydro11/16/201711/16/201711/16/2017PFAIL
DetailsTroy Cobbley
No approved plans on site. No inspection performed

Rick Phone #: ###-####
Sprinkler Plan Check9/22/2017 9/22/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  9/22/2017 DONE
DetailsTim Frost
Permit Ready to Issue  9/22/2017 DONE
DetailsChristina Prado
All requirements met
Issue and Print Permit  9/22/2017 DONE
Intake Approval  9/18/2017 PASS
Plan assigned to (Tim)9/18/2017 9/18/2017 DONE
DetailsTim Frost
Application received  9/14/2017 DONE
Application submitted via PDS Online on Sep 14 2017 9:28AM