INSP-Final Inspection | 10/27/2017 | 10/27/2017 | 10/27/2017 | P | PASS |
Troy Cobbley
|
|
|
Jim Danes Phone #: ###-#### Inspection requested via web by Connie Danes
|
INSP-Final Inspection | 10/13/2017 | 10/16/2017 | 10/16/2017 | P | FAIL |
Jim Page
|
|
|
Provide escutcheons for the fire sprinkler heads that are missing. Fire sprinkler head needs to be installed in storage room located near the back of the tenant space, northwest side.
|
Sprinkler Plan Check | 10/13/2017 | | 10/13/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/13/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
All met
|
Issue and Print Permit | | | 10/13/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/9/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/9/2017 | | 10/9/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/9/2017 | | 10/9/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/9/2017 | | FAIL |
Tim Frost
|
|
|
|
Application received | | | 9/19/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Sep 19 2017 7:44PM
|