Permit Information
Permit NumberFIR17-00553
StatusIssued
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 9189 W BROGAN DR
Project NameBrogan 4 plex
Customer Number 
ePlanReviewYes
Description
[Brogan Four Plex]
The fire sprinkler scope of work consists of replacing the piping and sprinklers in the two eastern units. The sprinklers only will be replaced on the western units. The piping and sprinklers are being replaces due to fire damage.

Plan Mod #1 – 9/27/2017
Change sprinkler type and pipe sizing.

Alternative Materials and Methods:

• There are no AMM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Sprinkler Rough-in10/12/201710/13/201710/13/2017ACANC
DetailsTroy Cobbley
After speaking with plan review and ADA county it turns out that this project is not with-in Boise City juridiction. I notified Kyle with Shilo, Brian Gilbert with ADA county. All previous inspections are void.
INSP-Sprinkler Rough-in/Hydro10/12/201710/13/201710/13/2017APASS
DetailsTroy Cobbley
Overhead hydro passed.
INSP-Sprinkler Rough-in10/10/201710/11/201710/11/2017APART
DetailsTroy Cobbley
Rough-in is passed but piping can not be covered until a tenting inspection has been passed. Currently no tenting has been installed. Also spray foam has been used extensiveely on the piping and will need to be approved to be used. No piping to be covered.
CHANGE STATUS TO (ISS)  10/3/2017 DONE
DetailsChristina Prado
Plan Modification Accepted  10/3/2017 DONE
Plan assigned to (Tim)10/3/2017 10/3/2017 DONE
DetailsTim Frost
Sprinkler Plan Check10/3/2017 10/3/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/3/2017 DONE
Permit Ready to Issue  10/3/2017 DONE
DO NOT RE ISSUE PLAN MOD
CHANGE STATUS TO (ISS)  10/3/2017 DONE
(F) Reprint permit  10/3/2017 DONE
Plan Modification Accepted  9/27/2017 DONE
Plan assigned to (Tim)9/27/2017 9/27/2017 DONE
DetailsTim Frost
Sprinkler Plan Check9/27/2017 9/27/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/27/2017 DONE
Permit Ready to Issue  9/27/2017 DONE
PLAN MOD - DO NOT REISSUE
Sprinkler Plan Check9/22/2017 9/22/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  9/22/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  9/22/2017 DONE
DetailsTim Frost
Permit Ready to Issue  9/22/2017 DONE
DetailsChristina Prado
All requirements met
Issue and Print Permit  9/22/2017 DONE
(F) Reprint permit  9/22/2017 DONE
Intake Approval  9/21/2017 PASS
Plan assigned to (Tim)9/21/2017 9/21/2017 DONE
DetailsTim Frost
Application received  9/20/2017 DONE
Application submitted via PDS Online on Sep 20 2017 9:26AM