INSP-Final Inspection | 4/23/2019 | 4/24/2019 | 4/24/2019 | A | PASS |
Jim Page
|
|
|
Final inspection for underground supply complete.
Please call Lonnie with time frame. Phone #: ###-#### Inspection requested via web by Jeff Packham
|
INSP-Sprinkler Rough-in | 3/26/2018 | 3/26/2018 | 3/26/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for remaining underground complete, approved for cover.
|
Plan Modification Accepted | | | 1/19/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/19/2018 | | 1/19/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/19/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/19/2018 | | DONE |
|
|
|
no charge for plan mod per Tim F
|
INSP-Sprinkler Rough-in | 10/9/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
INSP-Sprinkler Rough-in | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PART |
Jim Page
|
|
|
Partial rough to cover for underground supply complete, stub up to approximately 15 feet from stub up approved for cover. Remaining underground to be installed at a later date.
|
Application received | | | 10/3/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 3 2017 11:01AM
|
Intake Approval | | | 10/3/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/3/2017 | | 10/3/2017 | | DONE |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/3/2017 | | DONE |
|
|
|
Sent to Ron. Waiting on his opinion for the FDC locations.
|
Sprinkler Plan Check | 10/3/2017 | | 10/3/2017 | | FAIL |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/3/2017 | | 10/3/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/3/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/3/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 10/3/2017 | | DONE |
|
|
|
|