INSP-Final Inspection | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in/Hydro | 10/9/2017 | 10/10/2017 | 10/10/2017 | A | CANC |
Troy Cobbley
|
|
|
Wrong inspection type scheduled and wrong suite number.
Stan Phone #: ###-####
|
INSP-Final Inspection | 10/6/2017 | 10/9/2017 | 10/9/2017 | A | FAIL |
Troy Cobbley
|
|
|
Left voice message on contacts voice mail at 7am. Went to project site and waited till nearly 8am but not contact made. I did speak to the project super intendant about fire alarm and life safety requirements.
wants before 8am (told him to call Troy to arrange time) // Stan Phone #: ###-####
|
Plan assigned to (Lee) | 10/4/2017 | | 10/4/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/4/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 10/4/2017 | | 10/4/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/4/2017 | | DONE |
|
|
|
Quick permit approved. No review comments.
|
Permit Ready to Issue | | | 10/4/2017 | | DONE |
|
|
|
all met
|
Issue and Print Permit | | | 10/4/2017 | | DONE |
|
|
|
|
Application received | | | 10/3/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 3 2017 1:19PM
|