Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberFIR17-00586
StatusFinaled
Name SHILO AUTOMATIC SPRINKLER CO
Site Address 150 N CAPITOL BLVD
Project NameBOISE CITY HALL RENOVATION
Customer Number 
ePlanReviewYes
Description
[Boise City Hall Plaza Renovation] - Quick Permit
ATTACH TO AN EXISTING 2½" MAIN WITH A 2½X1¼" MECHANICAL TEE AND RUN A 1¼" LINE OUT TO 4 HEADS IN ORDER TO ADEQUATELY COVER THE NEWLY EXPANDED VESTIBULE ON THE FIRST FLOOR.

[BLD16-04392]
For the renovation of the existing plaza to create a new streetscape with work to include the removal of the existing concrete, pavers and entry area and the construction of a new fountain, installation of new landscaping and general site work. The existing entry vestibule will be expanded approximately 324 sq. ft. beneath the existing second floor with the existing doors to be relocated and new led lighting installed along with some of the existing ductwork being reconfigured. The occupant load for the plaza is 719 total. There is no change in occupant load for the building as the area to be enclosed is already within the perimeter of the exterior walls of the building. This is a fully fire sprinklered and alarmed building. Any alterations to the sprinkler or alarm systems shall comply with NFPA 13 and 72 as regulated by the fire department. CDM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection6/21/20186/22/20186/22/2018APASS
DetailsJim Page
Final fire sprinkler inspection for area of work complete.

Phone #: ###-#### Inspection requested via web by Stan Beus
INSP-Sprinkler Rough-in10/12/201710/13/201710/13/2017APASS
DetailsJim Page
Passed on vesitbule.
Sprinkler Plan Check10/5/2017 10/5/2017 PASS
DetailsTim Frost
Please, see attached comments.
PLANS/APPL TAKEN TO FRONT DESK  10/5/2017 DONE
DetailsTim Frost
Permit Ready to Issue  10/5/2017 DONE
all met
Issue and Print Permit  10/5/2017 DONE
Intake Approval  10/4/2017 PASS
Plan assigned to (Tim)10/4/2017 10/4/2017 DONE
DetailsTim Frost
Sprinkler Plan Check10/4/2017 10/4/2017 FAIL
DetailsTim Frost
1st review completed  10/4/2017 FAIL
DetailsTim Frost
Application received  10/3/2017 DONE
Application submitted via PDS Online on Oct 3 2017 6:43PM