INSP-Supply line flush | 3/22/2018 | 3/23/2018 | 3/23/2018 | A | DONE |
Jim Page
|
|
|
Underground main line flush complete.
|
INSP-Sprinkler Rough-in | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | PASS |
Jim Page
|
|
|
Hydrostatic test for underground supply complete.
|
INSP-Sprinkler Rough-in/Hydro | 10/19/2017 | 10/20/2017 | 10/20/2017 | A | CANC |
Jim Page
|
|
|
Duplicate inspection request, this request is cancelled.
|
INSP-Sprinkler Rough-in | 10/11/2017 | 10/12/2017 | 10/12/2017 | A | PART |
Troy Cobbley
|
|
|
Underground supply piping is ok to bury except for the stub-in to the building which still needs a thrust block poured for the "in building riser".
|
Issue and Print Permit | | | 10/11/2017 | | DONE |
|
|
|
|
Intake Approval | | | 10/10/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/10/2017 | | 10/10/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/10/2017 | | 10/10/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 10/10/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/10/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/10/2017 | | DONE |
|
|
|
all met
|
Application received | | | 10/4/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 4 2017 11:53AM
|