INSP-Final Inspection | 11/20/2017 | 11/21/2017 | 11/21/2017 | P | PASS |
Jim Page
|
|
|
Final fire alarm inspection passed/complete.
|
INSP-Final Inspection | 11/6/2017 | 11/7/2017 | 11/7/2017 | A | FAIL |
Jim Page
|
|
|
Mag locks on the east and west exterior doors need to interface with the fire alarm panel, mag locks need to release under general fire alarm. Ceiling mounted audio/visual devices located in the level 1 locker/shower rooms need to be changed to a weather proof device.
|
Plan assigned to (Lee) | 10/13/2017 | | 10/13/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 10/13/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 10/13/2017 | | 10/13/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 10/13/2017 | | DONE |
|
|
|
Plans approved with review comments.
|
Permit Ready to Issue | | | 10/13/2017 | | DONE |
|
|
|
all met
|
Issue and Print Permit | | | 10/13/2017 | | DONE |
|
|
|
|
Application received | | | 10/5/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 5 2017 1:31PM
|