Permit NumberFIR17-00617
StatusFinaled
Name TREASURE VALLEY FIRE PROTECTION
Site Address 2603 W EASTOVER TER
Project NameBoise Depot UG Repair
Customer NumberUDG ONLY
ePlanReviewYes
Description
[Boise Depot UG Repair]
To install a new 8" fire service to supply an existing hydrant and to replace an existing 4" Sch 40 fire service line with a new 6" DI Fire Service line, and install a new 6" riser with back flow

There does not seem to be an associated building permit at this time.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection11/29/201711/29/201711/29/2017APASS
DetailsTroy Cobbley
Permit finaled
INSP-Sprinkler Rough-in/Hydro11/8/201711/8/201711/8/2017PPASS
DetailsTroy Cobbley
Underground hydro test passed

Troy Phone #: ###-####
INSP-Supply line flush11/2/201711/3/201711/3/2017APASS
DetailsTroy Cobbley
Underground supply line fluch passed. Jeff got 3psi out of the 4" flushing outlet
INSP-Supply line flush11/1/201711/2/201711/2/2017PCANC
DetailsTroy Cobbley
CALL LONNIE w/TVFP.
NEED THIS UNDERGROUND FLUSHED Phone #: ###-#### >> Inspection requested via web by Brad Bettencourt Inspection cancelled from web by: Brad Bettencourt
INSP-Sprinkler Rough-in11/1/201711/2/201711/2/2017APASS
DetailsTroy Cobbley
The remaining underground supply piping is ok to cover.
INSP-Sprinkler Rough-in10/26/201710/27/201710/27/2017APASS
DetailsTroy Cobbley
Cover inspection at South Bore is passed and can be covered. This is from the Suez point of connection to Big Mike the locomotive.
INSP-Sprinkler Rough-in10/23/201710/24/201710/24/2017PPART
DetailsTroy Cobbley
Cover inspection for partial underground passed. See the city approved plans for location of piping that is ok for cover. Today was for riser to the tee.
Issue and Print Permit  10/23/2017 DONE
Application received  10/20/2017 DONE
Application submitted via PDS Online on Oct 20 2017 12:47PM
Intake Approval  10/20/2017 PASS
Plan assigned to (Tim)10/20/2017 10/20/2017 DONE
DetailsTim Frost
Sprinkler Plan Check10/20/2017 10/20/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  10/20/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  10/20/2017 DONE
DetailsTim Frost
Miscellaneous action  10/20/2017 DONE
Spoke to the assitant fire marshall. He is ok with the new 8" line feeding the existing hydrant and the existing sprinkler system since this an exsiting condition.
Miscellaneous action  10/20/2017 DONE
Spoke with Jeff Packham at Treasure Valley Fire Protection . Explained to him his company would have to be responsible for the new 8" underground fire service line per Idaho State Requirments. He aggreed.
Permit Ready to Issue  10/20/2017 DONE
all met