INSP-Final Inspection | 2/5/2018 | 2/6/2018 | 2/6/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Sprinkler Rough-in/Hydro | 1/22/2018 | 1/22/2018 | 1/22/2018 | P | DONE |
Jim Page
|
|
|
Underground hydrostatic witnessed, no pressure loss observed at riser supplied gauge.
|
INSP-Supply line flush | 1/19/2018 | 1/22/2018 | 1/22/2018 | A | DONE |
Jim Page
|
|
|
Underground flush complete.
|
INSP-Sprinkler Rough-in | 11/13/2017 | 11/13/2017 | 11/13/2017 | P | PASS |
Jim Page
|
|
|
Rough to ocver inspection complete, insulation for attic space is on the deck, piping does not require tenting, overhead fire sprinkler piping approved for cover.
|
INSP-Sprinkler Rough-in | 11/8/2017 | 11/8/2017 | 11/8/2017 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for underground supply complete, approved for cover.
|
Sprinkler Plan Check | 10/25/2017 | | 10/25/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/25/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 10/25/2017 | | DONE |
|
|
|
All Met
|
Issue and Print Permit | | | 10/25/2017 | | DONE |
|
|
|
|
Application received | | | 10/23/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 23 2017 9:09AM
|
Intake Approval | | | 10/23/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/23/2017 | | 10/23/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/23/2017 | | 10/23/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/23/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/23/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|