INSP-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | PASS |
Troy Cobbley
|
|
|
Permit finaled
|
INSP-Sprinkler Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Correctlons have been made at the mezzanine
|
Plan Modification Accepted | | | 12/29/2017 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 12/29/2017 | | 12/29/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 12/29/2017 | | 12/29/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/29/2017 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 12/29/2017 | | DONE |
|
|
|
Plan Mod Approved, DO NOT REISSUE
|
CHANGE STATUS TO (ISS) | | | 12/29/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/29/2017 | | DONE |
|
|
|
|
INSP-Sprinkler Rough-in | 12/20/2017 | 12/21/2017 | 12/21/2017 | P | FAIL |
Troy Cobbley
|
|
|
Todays inspection was for the mezzanine in the back area. I had to fail it due to heads overspaced from the exterior wall, pipe size does not match plans and possible need for branchline restraints.
Contact Scott Powada - ###-####
|
INSP-Sprinkler Rough-in | 12/12/2017 | 12/13/2017 | 12/13/2017 | A | PASS |
Troy Cobbley
|
|
|
The Sales Floor area, as marked on the plans, is ok for cover
Contact Scott Powada ###-#### 30 min prior to TRC Insp Start please
Thank YOU Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
Plan Modification Accepted | | | 12/7/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/7/2017 | | 12/7/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/7/2017 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 12/7/2017 | | DONE |
|
|
|
Plan Mod Approved
|
Issue and Print Permit | | | 12/4/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 12/1/2017 | | 12/1/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/1/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/1/2017 | | DONE |
|
|
|
Met
|
Sprinkler Plan Check | 11/29/2017 | | 11/29/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/29/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 11/21/2017 | | 11/21/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/21/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 11/20/2017 | | 11/20/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/20/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Sprinkler Plan Check | 11/2/2017 | | 11/2/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
Miscellaneous action | | | 11/2/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 10/27/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 10/27/2017 | | 10/27/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 10/27/2017 | | 10/27/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 10/27/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 10/27/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 10/26/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 26 2017 12:46PM
|