Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberFIR17-00633
StatusFinaled
Name FIRE SENTRY SYSTEMS
Site Address 701 E BOISE AVE
Project NameTimberline High School
Customer Number 
ePlanReviewYes
Description
Addition of new 2 story west wing of school to include fire alarm detection and notification. Because the existing fire alarm system is obsolete and at capacity, a new system will be installed during construction of the west wing. Once new construction is complete, the new system will be expanded to replace all alarm detection and emergency communication functions of the old system. Fire alarm is associated with building permit BLD17-00980.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Telephone call  12/3/2018 DONE
John Siewert called to say that it appears that approximately 150 in duct / duct detectors were omited from the original design. These were found by electricians removing the old system once the project had been completed. Fire Sentry has received mechanical drawings and provided pricing for the installation of the missed devices and will be submitting for a new permit on the added work.
INSP-Final Inspection8/16/20188/17/20188/17/2018APASS
DetailsJim Page
Final fire alarm inspection complete per Lee Meredith.

Phone #: ###-#### Inspection requested via web by John Siewert
INSP-Alarm Testing8/17/20188/17/20188/17/2018PPASS
DetailsLee G Meredith
INSP-Final Inspection7/26/20187/26/20187/26/2018APART
DetailsJim Page
Audilble/visual notification tested, sync issue between school and addition will need to be repaired. All tamper and flow switches have been tested as well as portable buildings.

Zak Anderson - Technician Phone #: ###-#### Inspection requested via web by John Siewert
INSP-Conference3/21/20183/26/20183/26/2018ADONE
DetailsJim Page
Fire alarm conference complete.
Miscellaneous action  2/23/2018 DONE
Emailed John Siewert requesting a new approval letter from the engineer of record. John supplied a link to the approved submittal. Print of the appropriate pages was uploaded.
Alarm Plan Check2/23/2018 2/23/2018 PASS
DetailsLee G Meredith
PLANS TAKEN FRONT DESK ALARM  2/23/2018 DONE
Plans approved as noted with review comments and requirements.
Permit Ready to Issue  2/23/2018 DONE
Issue and Print Permit  2/23/2018 DONE
Plan resubmittals received  2/21/2018 DONE
Miscellaneous action  2/15/2018 DONE
Requested an update, via email, from John Siewert on when the design resubmittal would take place.
Meeting  11/14/2017 DONE
Meeting with architect, electrical engineer, fire alarm contractor, electrical contractor and general contractor to discuss failed plan review comments. Each item was discussed. The primary concern was how and when occupancy was to take place. The engineer indicated the plan was to build the expansion but not occupy it until late summer. WHile the expansion was being built, the new fire alarm system would be added to the existing portion of the building. At that time, both system could be running. Once the new system was complete throughout the new and old building, the old one would be turned off and removed after the school year ended. New and old fire alarm control panels will be mounted next to each other. If the new building is to be occupied, the systems have to be interfaced to insure full evacuation and auxiliary function operate on both sides. The balance of items on the review comments are to be addressed by the engineer and the fire alarm contractor. Shilo sprinklers are to verify the existance of sprinklers at the existing stage. If no sprinklers exist, determination of any detection requirements will be evaluated.
1st review completed  10/31/2017 FAIL
See 1st fire alarm review comments.
Telephone call  10/30/2017 DONE
Called John Siewert to discuss design errors and the scope of work. Errors included insufficient visible notification, multiple fire alarm systems in a single building without interface, multi phased work plan, partial corridor smoke detection and ceiling heights. Emailed John with a follow up recaping our conversation.
Plan assigned to (Lee)10/27/2017 10/27/2017 DONE
DetailsLee G Meredith
Application received  10/26/2017 DONE
Application submitted via PDS Online on Oct 26 2017 2:45PM