INSP-Sprinkler Rough-in/Hydro | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | DONE |
Jim Page
|
|
|
Hydrostatic test for underground supply witnessed, no pressure loss observed at contractor provided gauge.
|
INSP-Supply line flush | 4/24/2018 | 4/25/2018 | 4/25/2018 | A | DONE |
Jim Page
|
|
|
Underground supply flush complete.
|
INSP-Sprinkler Rough-in | 11/17/2017 | 11/17/2017 | 11/17/2017 | P | PASS |
Troy Cobbley
|
|
|
Todays inspection was for the stub-out only.. Its 8" with a thrust block and bury wire. Piping is ok to cover.
|
Intake Approval | | | 11/1/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/1/2017 | | 11/1/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/1/2017 | | 11/1/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/1/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/1/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/1/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/1/2017 | | DONE |
|
|
|
|
Application received | | | 10/31/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Oct 31 2017 12:44PM
|