INSP-Final Inspection | 3/15/2018 | 3/15/2018 | 3/15/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection complete.
|
INSP-Final Inspection | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | FAIL |
Jim Page
|
|
|
Fire sprinkler heads in room 133 are lees than 6 feet apart, a minimum of 6 feet between heads is required.
|
INSP-Sprinkler Rough-in | 3/9/2018 | 3/9/2018 | 3/9/2018 | P | PASS |
Jim Page
|
|
|
Rough to cover inspection for area of work complete, approved for cover.
|
INSP-Sprinkler Rough-in | 3/8/2018 | 3/9/2018 | 3/9/2018 | P | FAIL |
Jim Page
|
|
|
Multiple fire sprinkler heads are over-spaced, coverage needs to be adjusted for correct spacing.
|
INSP-Sprinkler Rough-in | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping above hardlids complete, hardlids approved for cover.
|
Sprinkler Plan Check | 1/4/2018 | | 1/4/2018 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2018 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 1/4/2018 | | DONE |
|
|
|
Met
|
Issue and Print Permit | | | 1/4/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 1/3/2018 | | 1/3/2018 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 1/3/2018 | | FAIL |
Tim Frost
|
|
|
|
Intake Approval | | | 1/2/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/2/2018 | | 1/2/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/2/2018 | | 1/2/2018 | | FAIL |
Tim Frost
|
|
|
Prescreen
|
Intake Approval | | | 1/2/2018 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 1/2/2018 | | 1/2/2018 | | DONE |
Tim Frost
|
|
|
|
Application received | | | 11/2/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 2 2017 8:49AM
|