INSP-Final Inspection | 2/21/2018 | 2/21/2018 | 2/21/2018 | P | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in | 2/14/2018 | 2/15/2018 | 2/15/2018 | P | PASS |
Jim Page
|
|
|
Rough in inspection for area of work complete.
|
Plan Modification Accepted | | | 1/31/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 1/31/2018 | | 1/31/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/31/2018 | | 1/31/2018 | | DONE |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2018 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 1/31/2018 | | DONE |
|
|
|
Plan Mod Approved. no fee per Tim F.
|
(F) Reprint permit | | | 1/31/2018 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/30/2017 | | 11/30/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/30/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/30/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/30/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/29/2017 | | 11/29/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/29/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Intake Approval | | | 11/20/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/20/2017 | | 11/20/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/20/2017 | | 11/20/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 11/20/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/20/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 11/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2017 11:09AM
|