INSP-Final Inspection | 10/10/2018 | 10/10/2018 | 10/10/2018 | P | PASS |
Troy Cobbley
|
|
|
permit finaled
John Phone #: ###-####
|
INSP-Final Inspection | 9/21/2018 | 9/24/2018 | 9/24/2018 | A | FAIL |
Troy Cobbley
|
|
|
Missing ceiling tile
John Phone #: ###-####
|
INSP-Sprinkler Rough-in | 1/16/2018 | 1/16/2018 | 1/16/2018 | P | PASS |
Troy Cobbley
|
|
|
Rough-in passed. Piping can be covered.
Payton Phone #: ###-####
|
Plan Modification Accepted | | | 1/4/2018 | | DONE |
|
|
|
|
Plan assigned to (Tim) | 1/4/2018 | | 1/4/2018 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 1/4/2018 | | 1/4/2018 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/4/2018 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/4/2018 | | DONE |
|
|
|
DO NOT REISSUE. PLAN MOD
|
Issue and Print Permit | | | 1/4/2018 | | DONE |
|
|
|
|
INSP-Final Inspection | 11/20/2017 | 11/21/2017 | 11/21/2017 | A | FAIL |
Troy Cobbley
|
|
|
Project is not ready for a final. Todays inspection was just for a rough-in. Hard lids are ok to cover. The remaining piping is not ok for cover. I noted three overspaced pendant heads in the large open area.
|
Intake Approval | | | 11/20/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/20/2017 | | 11/20/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/20/2017 | | 11/20/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/20/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/20/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/20/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/20/2017 | | DONE |
|
|
|
|
Application received | | | 11/6/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 6 2017 3:07PM
|