Permit Information
Permit NumberFIR17-00656
StatusFinaled
Name ALL VALLEY FIRE
Site Address 2710 W SUNRISE RIM RD
Project NameSunrise Rim Gym
Customer Number 
ePlanReviewYes
Description
[Sunrise Rim Gym] - Quick Permit
Relocate 2 SSP sprinkler heads in new Gym bathroom area to accommodate proper sprinkler spacing.

[BLD17-03277]
A tenant improvement project on the first floor of a two story commercial office building. The project will consist of splitting one larger tenant space into 1 smaller tenant space and 1 common area gym to be used by all tenants. Walls will be added to create a new unisex restroom/shower room that meets ADA. There will be new finishes. No structural members will be altered or removed. This building is fully fire sprinklered any alteration or modification to the sprinkler system shall be per NFPA #13 as regulated by the fire department. RmH.
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
INSP-Final Inspection10/10/201810/10/201810/10/2018PPASS
DetailsTroy Cobbley
permit finaled

John Phone #: ###-####
INSP-Final Inspection9/21/20189/24/20189/24/2018AFAIL
DetailsTroy Cobbley
Missing ceiling tile

John Phone #: ###-####
INSP-Sprinkler Rough-in1/16/20181/16/20181/16/2018PPASS
DetailsTroy Cobbley
Rough-in passed. Piping can be covered.

Payton Phone #: ###-####
Plan Modification Accepted  1/4/2018 DONE
Plan assigned to (Tim)1/4/2018 1/4/2018 DONE
DetailsTim Frost
Sprinkler Plan Check1/4/2018 1/4/2018 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  1/4/2018 DONE
Permit Ready to Issue  1/4/2018 DONE
DO NOT REISSUE. PLAN MOD
Issue and Print Permit  1/4/2018 DONE
INSP-Final Inspection11/20/201711/21/201711/21/2017AFAIL
DetailsTroy Cobbley
Project is not ready for a final. Todays inspection was just for a rough-in. Hard lids are ok to cover. The remaining piping is not ok for cover. I noted three overspaced pendant heads in the large open area.
Intake Approval  11/20/2017 PASS
Plan assigned to (Tim)11/20/2017 11/20/2017 DONE
DetailsTim Frost
Sprinkler Plan Check11/20/2017 11/20/2017 PASS
DetailsTim Frost
Please, see attached comments.
1st review completed  11/20/2017 PASS
DetailsTim Frost
PLANS/APPL TAKEN TO FRONT DESK  11/20/2017 DONE
DetailsTim Frost
Permit Ready to Issue  11/20/2017 DONE
Issue and Print Permit  11/20/2017 DONE
Application received  11/6/2017 DONE
Application submitted via PDS Online on Nov 6 2017 3:07PM