INSP-Final Inspection | 1/23/2018 | 1/24/2018 | 1/24/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Final Inspection | 1/10/2018 | 1/16/2018 | 1/16/2018 | A | PART |
Jim Page
|
|
|
Final fire sprinkler inspection complete, FIR permit for fire sprinklers will remain in issued status untill core and shell/garage permit is finaled.
|
INSP-Sprinkler Rough-in/Hydro | 1/8/2018 | 1/9/2018 | 1/9/2018 | P | DONE |
Jim Page
|
|
|
Hydrostatic test for TI overhead fire sprinkler piping witnessed, no observed pressure loss at riser gauge.
|
INSP-Sprinkler Rough-in | 1/8/2018 | 1/8/2018 | 1/8/2018 | P | PASS |
Jim Page
|
|
|
Rough to ocver inspection for overhead fire sprinkler piping in area of work complete, approved for cover.
|
INSP-Sprinkler Rough-in | 12/11/2017 | 12/12/2017 | 12/12/2017 | A | PART |
Jim Page
|
|
|
Rough to cover inspection for overhead fire sprinkler piping located above hardlids in area of work complete, hardlids in area of work approved for cover.
|
Issue and Print Permit | | | 11/28/2017 | | DONE |
|
|
|
|
Sprinkler Plan Check | 11/27/2017 | | 11/27/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/27/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/27/2017 | | DONE |
|
|
|
All Met
|
Intake Approval | | | 11/22/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/22/2017 | | 11/22/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/22/2017 | | 11/22/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 11/22/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/22/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 11/7/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 7 2017 3:50PM
|