INSP-Final Inspection | 1/30/2018 | 1/30/2018 | 1/30/2018 | P | PASS |
Jim Page
|
|
|
Previously noted items have been repaired, final fire alarm inspection complete.
|
INSP-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | FAIL |
Jim Page
|
|
|
Audible notification did not operate in area of work, visual notification operated correctly. Door holder magnet release was not tested, hardware was not installed on doors at time of inspection.
|
Application received | | | 11/14/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 14 2017 12:26PM
|
Plan assigned to (Lee) | 11/14/2017 | | 11/14/2017 | | DONE |
Lee G Meredith
|
|
|
|
1st review completed | | | 11/14/2017 | | PASS |
|
|
|
|
Alarm Plan Check | 11/14/2017 | | 11/14/2017 | | PASS |
Lee G Meredith
|
|
|
|
PLANS TAKEN FRONT DESK ALARM | | | 11/14/2017 | | DONE |
|
|
|
Review approved. No plans required and no review comments.
|
Permit Ready to Issue | | | 11/14/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/14/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/14/2017 | | DONE |
|
|
|
|