INSP-Final Inspection | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PASS |
Jim Page
|
|
|
Final fire sprinkler inspection for area of work complete.
|
INSP-Sprinkler Rough-in/Hydro | 1/5/2018 | 1/8/2018 | 1/8/2018 | A | PASS |
Jim Page
|
|
|
Rough in inspection complete.
|
INSP-Sprinkler Rough-in | 12/5/2017 | 12/6/2017 | 12/6/2017 | A | PASS |
Jim Page
|
|
|
Rough to ocver inspection for area of work complete, area of work approved for cover. A fire sprinkler head will need to be added in the entry of the mens restroom, no fire sprinkler head at time of inspection (this area is out of the scope of work but is part of the tenant space). Fire sprinkler head will need to be added to pass life fire safety inspection at project completion.
|
Intake Approval | | | 11/21/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/21/2017 | | 11/21/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/21/2017 | | 11/21/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
1st review completed | | | 11/21/2017 | | PASS |
Tim Frost
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/21/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 11/21/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 11/21/2017 | | DONE |
|
|
|
|
Application received | | | 11/17/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 17 2017 1:38PM
|