INSP-Final Inspection | 1/26/2018 | 1/29/2018 | 1/29/2018 | A | PASS |
Troy Cobbley
|
|
|
permit finaled
Contact Scott Powada ###-#### 30 min prior to fire final start for Inspectors Test System #1 please.
Thank YOU, Phone #: ###-#### Inspection requested via web by Teri Cruickshank
|
INSP-Final Inspection | 1/25/2018 | 1/26/2018 | 1/26/2018 | A | FAIL |
Troy Cobbley
|
|
|
This permit can be finaled when the flow switch for the sprinkler riser that serves this tenant space has been tested. It currently has no inspectors test for testing of the new flow switch
|
INSP-Sprinkler Rough-in | 1/5/2018 | 1/5/2018 | 1/5/2018 | A | PASS |
Troy Cobbley
|
|
|
Rough-in passed.
|
Sprinkler Plan Check | 12/14/2017 | | 12/14/2017 | | PASS |
Tim Frost
|
|
|
Please, see attached comments.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/14/2017 | | DONE |
Tim Frost
|
|
|
|
Permit Ready to Issue | | | 12/14/2017 | | DONE |
|
|
|
|
Issue and Print Permit | | | 12/14/2017 | | DONE |
|
|
|
|
(F) Reprint permit | | | 12/14/2017 | | DONE |
|
|
|
|
Intake Approval | | | 11/27/2017 | | PASS |
|
|
|
|
Plan assigned to (Tim) | 11/27/2017 | | 11/27/2017 | | DONE |
Tim Frost
|
|
|
|
Sprinkler Plan Check | 11/27/2017 | | 11/27/2017 | | FAIL |
Tim Frost
|
|
|
|
1st review completed | | | 11/27/2017 | | FAIL |
Tim Frost
|
|
|
|
Miscellaneous action | | | 11/27/2017 | | DONE |
Tim Frost
|
|
|
Emailed contractor in regards to failed review.
|
Application received | | | 11/21/2017 | | DONE |
|
|
|
Application submitted via PDS Online on Nov 21 2017 1:10PM
|